Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Integrative Pilot Credit - Design or Construction Credit

Pilot-Credits PC60:Integrative Process
posted by  Devki Wright  on 

Hi there - when submitting the documentation for this credit, is this considered a design or construction credit?

1
Tue May 24, 2016, 12:12 am

LEED-GA as a student

General forums
posted by  PRATIK KUMAR  on 

Hello everyone, Kindly help me out in providing a proper knowledge about LEED-GA exams as a student. As i am a working professional and doing my PG-Diploma in Urban planning as part time,and also i

1
Tue May 24, 2016, 1:13 pm

new ACP featuring Dynamic Plaque

General forums
posted by  Tristan Roberts  on 

As we reported on BuildingGreen.com (see EBOM certification. From the article:

0

Bus service in opposite directions

Healthcare-v4 LTc5:Access to quality transit
posted by  Bryan Finnegan  on 

The credit requires "Qualifying transit routes must have paired route service (service in opposite directions)" We have two transit routes that run within the required distance of an entry, but th

1
Wed May 25, 2016, 1:49 am

District Central plant heating only

NC-2009 EAp2:Minimum Energy Performance
posted by  Vipul Babriya  on 

I have a project with district steam from central plant for space heating only. The space cooling is provided by onsite using RTUs with Dx coil.

1
Tue May 24, 2016, 7:47 pm

Updating documentation with consistent or more recent dates?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Sara Goenner Curlee  on 

For various reasons, my project's Design Submittal got put on hold in 2014 after most of the work effort was done and uploaded to LEED Online.

1
Tue May 31, 2016, 12:10 pm

Glass Canopy over new concrete

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Haley Duncan  on 

Hello, I have a similar question to the post labeled " Glass Canopy over Compliant Hardscape." We have a glass canopy over new concrete. Can I count this area as compliant?

1
Mon Aug 1, 2016, 8:34 pm

Required parking lots and LEED boundary Calculations

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  kerry wang  on 

Hi all, We have a question about LEED boundary calculation as below: In order to save the land, our company has set up a shared parking lot in the area, so this project does not have new parking s

0

LEEDv4 - College Building Which Rating?

LEED Rating System Selection
posted by  ankur khandelwal  on 

We have a project in Texas which is having two Academic buildings (not connected) in a College, both of 4 floors having Lecture Theaters and Library.

0