NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
Recently, there was a discussion in this forum on exterior lighting being a mandatory requirement for EAP2 compliance.
LOCAL PLASTER COMPLIANCE PRODUCT
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by MARIA FERNANDA CORREA MENDIVELSO on
HI... How is the way for document compliance for a local product made with plaster and Shintech PVC Resin wich is used before apply final paint. Thanks
IEQp1 Reductions in supply air flows due to occupant adjustments
CI-2009 IEQp1:Minimum IAQ Performanceposted by Olga Yuil on
We have a Commercial Interior Project with underfloor air distribution (UFAD) system designed to include adjustable supply air diffusers in the floor, which can be used to adjust the amount of supp
LEED v4 BD+C - Core and Shell : Renewable energy production
CS-v4 EAc5:Renewable energy productionposted by Spyridon Kostopoulos on
Can anyone clarify for me please if for a Core and Shell certification, the total building energy costs would pertain only to those building installations which the developer controls and not those
Prescriptive method
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Emmanuel Pauwels on
Can we use the prescriptive method if there is a fixed exterior brise soleil in the façade? Can we use the 63 angle from the brise soleil to exclude part of the daylight area?
Schools project - large playing fields and open area
Pilot-Credits PC14:Walkable Streetsposted by Helen Kessler on
Would a project with large playing fields and open area have any possibility of meeting this credit requirement?
Selecting system type
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have a project that consists of both residential and non residential units. Per 90.1 2007G3.1.1 exception a. we need to use two HVAC system types for residential and non-residential separately.
car pool requirement vs no car for commuting restriction
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Noriko Nagazumi on
LEED NC SSc4.4 requires preferred parking for carpool or vanpools for 5% of total parking spaces. In our project of a company’s head quarter, there are certain numbers of parking will be installed
CONFUSED WITH FILTER RATING REQUIREMENT.
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by VEL MUTHU on
Hi, I am working on a project where the design scheme follows las described below. There are ERU’s which supplies the fresh air to AHU’s and FCU’s in the project.
Amphitheater Occupancy
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Peter Doo on
Our project is the back stage area of a seasonal outdoor amphitheater concert venue. The venue hosts concerts 35 days per year over a 24 week period.