Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Vairable flow showers

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Nicholas Bristow  on 

We are considering using multi-flow shower heads on a commercial office project for the locker rooms.

1
Tue Sep 22, 2015, 6:18 pm

LEED NC vs LEED HC

LEED Rating System Selection
posted by  Kerrie Racicot  on 

Hi there, We are working on project (an Ambulatory Care Center) that is primarily out-patient, however the ER is 24 hours and the Pharmacy is 24 hours.

1
Tue Sep 22, 2015, 7:18 pm

Demolished Building - Material Reuse

NC-2009 MRc3:Materials Reuse
posted by  Lauren Bellamy  on 

Our client has demolished the existing structures on our site and salvaged all the cladding and flooring materials (i.e.

1
Tue Sep 22, 2015, 8:48 pm

Time after Performance Period- EBOM 2009

Performance Period
posted by  Ana Carolina Montecinos Ongini  on 

I am a little confuse about how many days we have to submit the project after performance period ends. Is it 60 or 90 days? Thanks in advance

1
Thu Mar 24, 2016, 10:34 pm

IEQc8.1 Core and Shell credit with no tenant fit out

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Shelly Christman   on 

We are in a design build arrangement with an architect and owner to construct an office building with no planned tenant fit out at this time.

1
Thu Mar 23, 2017, 2:17 pm

Is touch-up paint exempt?

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Erin Holdenried  on 

This LEED Interpretation states that touch-up paint consists of small unanticipated quantities that can't be controlled by specifications, and therefore is exempt from the credit.

1
Thu Sep 24, 2015, 4:27 am

LEED NC v2009: Innovation Design

NC-2009 MRc2:Construction Waste Management
posted by  Paola Medina  on 

Batteries from other company could be encapsulated with concrete in the fund elevators instead of send to landfills?

0

Credit compliance using AVR as an alternative metric

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Zane Lichtneger  on 

I see some formal programs use “average vehicle ridership” (AVR) as an alternate metric. We are active participants with the Go Smart/Go Perks/Triangle Transit/Share The Ride program.

1
Fri Sep 25, 2015, 5:59 pm

Leed boundary for commercial interior

CI-2009 PIf1:Minimum Program Requirements
posted by  Elena Gonzi  on 

Hi, I have some question about LEED Commercial Interior certification : 1) Situation: we have a offices building that has a basement in common with other two offices buildings.

1
Wed Dec 30, 2015, 5:09 pm

Recycling Batteries

NC-2009 MRc2:Construction Waste Management
posted by  Paola Medina  on 

One of our environmental companies have a lot of batteries that they want to recycle in our LEED project instead of send to landfills through encapsulate with concrete in the background hole of ele

1
Mon Sep 28, 2015, 9:13 pm