Forum quick links
Graffiti Remover
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Ryan Tinus on
Hello all. I have a project that is purchasing graffiti remover for use on the exterior of the building. Do you have any guidance regarding VOC limits for this product?
Credit Denied
NC-2009 RPc1:Regional Priorityposted by Cynthia Estrada on
Hello All, Our project (zip 54703) just finished final design review and SSc1 was denied which was one of our RP credits as well.
Less than 100 regular occupants
EBOM-v4 LTc1:Alternative transportationposted by Charalampos Giannikopoulos on
According to Table 5 (Reference Guide, p. 49) for 100 regular building occupants the sample size needs to be 81.
MRpc69 Attainable in Commercial Interior Project
Pilot-Credits MRpc69:Construction and demolition waste managementposted by Erica Suarino on
This credit was easily attainable for an interior renovation in the New York metropolitan region.
Erosion and Sedimentation Control - Log
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Nicole Isk on
Hi, i got the follwoing comment from the review team on SSc3, and this is the first time i got this comment. Maybe, anyone can help me, what exactly they want me to do.
Minimum Protected area
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Roberto Meza on
Hi, I was wondering if there is a minimum percentage for the protected area for SSc5.1 compliance.
LEED AP BD+C V4 EXAM in one month!
posted by Moataz Sakkary on
Dear All Please guide me if any other way than studying the USGBC book, as I have to take me Exam by 15 of September???!! And what is exactly the eight tips companion workbook ?
District heating with renewable energy. Baseline?
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I'm modeling a district heating system according to option 2 of “Treatment of District or Campus Thermal Energy in LEED V2 and LEED 2009 – Design & Construction”.
Material cost question
CI-2009 MRc7:Certified Woodposted by David Rinard on
Some time ago I recall seeing information stating that in the MR Credits for manufactured products such as furniture users were directed to use the cost the customer paid for the product as opposed
Prerequisite energy performance using Onsite Renewable Energy?
NC-2009 EAp2:Minimum Energy Performanceposted by Kevin Gilleran on
The Bird's Eye View comments on this page indicate that the USGBC will allow projects to meet the 10% minimum energy performance threshold with onsite renewable energy.