Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Graffiti Remover

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Ryan Tinus  on 

Hello all. I have a project that is purchasing graffiti remover for use on the exterior of the building. Do you have any guidance regarding VOC limits for this product?

1
Wed Aug 5, 2015, 3:01 pm

Credit Denied

NC-2009 RPc1:Regional Priority
posted by  Cynthia Estrada  on 

Hello All, Our project (zip 54703) just finished final design review and SSc1 was denied which was one of our RP credits as well.

1
Tue Nov 10, 2015, 6:27 am

Less than 100 regular occupants

EBOM-v4 LTc1:Alternative transportation
posted by  Charalampos Giannikopoulos  on 

According to Table 5 (Reference Guide, p. 49) for 100 regular building occupants the sample size needs to be 81.

1
Thu Mar 3, 2016, 10:59 pm

MRpc69 Attainable in Commercial Interior Project

Pilot-Credits MRpc69:Construction and demolition waste management
posted by  Erica Suarino  on 

This credit was easily attainable for an interior renovation in the New York metropolitan region.

0

Erosion and Sedimentation Control - Log

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Nicole Isk  on 

Hi, i got the follwoing comment from the review team on SSc3, and this is the first time i got this comment. Maybe, anyone can help me, what exactly they want me to do.

1
Fri Aug 7, 2015, 3:31 pm

Minimum Protected area

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Roberto Meza  on 

Hi, I was wondering if there is a minimum percentage for the protected area for SSc5.1 compliance.

1
Fri Nov 27, 2015, 4:13 am

LEED AP BD+C V4 EXAM in one month!

General forums
posted by  Moataz Sakkary  on 

Dear All Please guide me if any other way than studying the USGBC book, as I have to take me Exam by 15 of September???!! And what is exactly the eight tips companion workbook ?

1
Mon Aug 10, 2015, 2:21 pm

District heating with renewable energy. Baseline?

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

I'm modeling a district heating system according to option 2 of “Treatment of District or Campus Thermal Energy in LEED V2 and LEED 2009 – Design & Construction”.

1
Wed Aug 12, 2015, 2:43 pm

Material cost question

CI-2009 MRc7:Certified Wood
posted by  David Rinard  on 

Some time ago I recall seeing information stating that in the MR Credits for manufactured products such as furniture users were directed to use the cost the customer paid for the product as opposed

1
Wed Dec 30, 2015, 5:48 pm

Prerequisite energy performance using Onsite Renewable Energy?

NC-2009 EAp2:Minimum Energy Performance
posted by  Kevin Gilleran  on 

The Bird's Eye View comments on this page indicate that the USGBC will allow projects to meet the 10% minimum energy performance threshold with onsite renewable energy.

1
Wed Aug 12, 2015, 2:15 pm