artificial grass
Healthcare-v2009 SSc9.1:Connection to the natural world - places of respiteposted by Emmanuel Pauwels on
If the outdoor area is made up of artificial turf, would that be a problem?
Laundromat vs. Central laundry in a building
NC-2009 SSc2:Development Density and Community Connectivityposted by Kathryn West on
Have you ever taken credit for laundry facilities in a condo or dormitory? Isn't this essentially a Laundromat/ more convenient than a Laundromat?
Baseline Fan Adjustment
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, There is an issue I'd like to ask some advice about it. It is for Baseline fan adjustment.
Enhanced IAQ Strategies - Hazardous Gases/Chemicals
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Tom Martin on
Has the pressure differential requirement of at least 5 pascals for LEED v2009 IEQc5 Indoor and Chemical Source Pollutant Control been eliminated from the requirement of this credit?
is this PC still open?
Pilot-Credits PC29:Housing and Jobs Proximityposted by Alfonzo Collins on
...and can I use it on a LEED-NC project? I'm working on a building in NYC, so this would be a very easy two points, if applicable. Thanks!
Calculating Gross Floor Area
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Maggie Hogan Skaug on
When calculating GFA, I assume you exclude the levels of the building dedicated to parking?
LEED-EBOM credit as ID credit
NC-2009 IDc1:Innovation in Designposted by Alfonzo Collins on
I was looking through LEED-EBOM and saw IEQc2.1, Occupant Comfort Survey. This seems like a pretty easy credit to achieve.
Spray Foam Insulation
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Claire DeCamp on
I recently had a project manager approach me concerning spray foam insulation that has been specified on a project.
Additions While Project is in Certification Review Process
Schools-2009 PIf2:Project Summary Detailsposted by Robert Fiala on
We have a large school project (340,000 sf) that has been submitted for the design phase review and all design phase points are reviewed and marked as anticipated.
Low impact Eco Resort
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by John Covello on
Hello, My company is looking to partner with the development of a low impact resort on an island located in Myanmar.