EQc5 - Parking Garages
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Kristopher Lashley on
We have a multi story underground parking structure that is exhausted with 26,000cfm P1, 32,000 cfm for P2 and P3.
Emergency generator fule meter
CI-2009 EAc3:Measurement and Verificationposted by Edwin Wealend on
Hi we have a LEED CI project that is served by an emergency back-up generator that serves multiple floors. Is it really a requirement to meter emergency back-up generator fuel?
measuring heat pump load for system submetering
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by ethan adams on
I have about 35 ceiling- mounted heat pumps throughout the building, and it would be cost-prohibitive to install a separate meter on each one.
Confirmation - perforated sticker sign
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Ian McCall on
Hello, Can someone confirm that an temporary (3 months) publicity perforated window decal installed by the future tenant on the glazed facade is out of the scope of the LEED NC or CS certification
Credit Interpretation Request to support SS p1.
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Marie-France Duthilleul on
When comparing your proposed ESC PLan Is there standard text language / narrative that clearly describs the requirements of Phase 1 and Phase II of the NPDES program.
Data Center PUE & Energy Star Rating
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Charalampos Giannikopoulos on
Is there a correlation of PUE (Power Utilization Effectiveness) and Energy Star rating?
Resilient Design
NC-2009 IDc1:Innovation in Designposted by Deborah Lucking on
We are required to address resilient design (e.g. against sea level rise, storm surge) in our project. Does anyone have any experience or words of advice about this? Thanks!
20 or More Basic Services - Innovation Credit?
CS-2009 SSc2:Development Density and Community Connectivityposted by Ian McCall on
Hello, Is it possible to get an innovation credit for projects that have 20 or more basic services (that are different)? Regards, Ian
Greenroof, water retention with perlite
NC-2009 WEc1:Water Efficient Landscapingposted by FABIO VIERO on
I was wondering if anyone had already used a roof garden including the perlite. Perlite is a volcanic rock effusive varying in color between gray and pink, whose chemical composition is similar to
Typical Days of Operation for a Combo Research & Classroom bldg.
posted by Joyce Kelly on
Typical days of operation for the students, professors & educational staff is 206 and typical days of operation for the researchers and associated staff is 260.