Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

How to deal with a multi-use college residence hall

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Mike Stopka  on 

I am working on a rather unique residence hall building that has a variety of uses. I am trying to determine what spaces need bike storage and shower/changing facilities.

1
Mon Jun 1, 2015, 10:18 am

IEQp1 ventilation cals

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Gordon Nielson  on 

I am calculating the ventilation requirements for a conference room. From the ASHRAE Table 6-1 I selected .06 cfm/ft2 and 5 cfm/person. The room has occupancy of 8 people.

1
Fri May 29, 2015, 4:37 pm

1 year contract?

NC-2009 EAc6:Green power
posted by  Erin Holdenried  on 

In v2.2 is was acceptable to have a 1 yr contract as long as the total green power purchased was equivalent to 2 years of 35% electricity, or year of 70% electricity for exemplary performance.

1
Fri May 29, 2015, 6:34 pm

Bamboo and CS

CS-2009 MRc6:Certified Wood
posted by  Rosario Lidia Maguey Peña  on 

Hi! Is bamboo included in credit MRc6 for Core and Shell? We have a Core and Shell project in which the client wants an specific wood finish for the ceiling in the Lobby.

1
Tue Jun 2, 2015, 1:58 pm

Land disturbed vs. land supporting normal building operation

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Michelle Bombeck  on 

This question has been asked many times and I'm wondering if anyone has some more recent experience with a submittal.

1
Thu Jul 9, 2015, 7:45 pm

62MZCalc Excel Program

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Gordon Nielson  on 

which is the correct abbreviation for a single duct constant volume system with fresh air introduced at the fan?

1
Mon Jul 6, 2015, 10:28 pm

62MZCalc

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Gordon Nielson  on 

I noticed, I cannot enter rooms that require exhaust like restrooms and lockers. Do I exclude them on the excel spread sheet?

1
Mon Jul 6, 2015, 10:21 pm

Calculating Daily Average for Transient Users

NC-2009 PIf3:Occupant and Usage Data
posted by  Randy Weatherly  on 

Based on the examples presented on this site, the daily average is based on 365 days a year. Is this correct or should it be based on actual days the facility is open for business? Thanks

1
Tue Dec 15, 2015, 9:21 pm

EQ Space Matrix file on USGBC's website is damaged

General forums
posted by  John McFarland  on 

Would someone be able to share the current April 2015 copy of the EQ Space Matrix on this site without linking to USGBC Credit Resources?

1
Mon Jun 1, 2015, 7:19 pm

Wedding Hall with Dance space Design for Credit 7.1 & 7.2

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Lew Bonadies  on 

We wish to pursue the credits IEQ 7.1 & 7.2 , the space is auditorium seating with a dance floor for Wedding .(Area - 5300 sq ft , Occupancy 370 People), having office spaces on other floors .

0