Forum quick links
HET Retrofit
NC-2009 WEc3:Water Use Reductionposted by Matthew Catterall on
I've noticed that dual-flush flushometer retrofit kits are mentioned as a way to earn this credit on existing commercial toilets (rather than replace the entire toilet); however, there is no mentio
Residents excluded?
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Miranda Lescaze on
A portion of our building is office space and a portion is multi-family senior residences.
WEp1 - PIf3 link - new LEED on line
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Todd Bundren on
My project was upgraded to the new version of LEED online around the beginning of the year so I am getting used to the new set up (so far it is very nice).
Parking Area Clarification
posted by Kristy O'Hagan on
In the latest Update to LEED Interpretation (LI) 10079 & 10080, the 75% maximum limit on area devoted to vehicle storage & circulation has been removed. As of October 1, 2012: So as not to
Wall Skirting - or - Baseboards
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Blanca Cespedes on
I have a vinyl baseboard, does it also have to be Floorscore? Thanks,
Adding carpet to LEED Platinum NC building
posted by Alireza Anvari on
Hi, I'm new here and new in LEED, I apologize for my ignorance. I work as a PM in a LEED Platinum NC building. We are planning to install carpet in the top floor hall way.
government areas
NC-2009 SSc2:Development Density and Community Connectivityposted by patricia vasconcellos on
I have a project that is in a government area. A region of the city that has been set aside to house all the public departments.
Owner installed lighitng
CI-2009 EAp2:Minimum Energy Performanceposted by Allen Cornett on
I am trying to find out if a building owner is installing new lighting in a space, will a future tenant be able to included the existing lighting in the lighting power density calculations for EAp2
Task light process load or lighting load?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I saw some people say task light is process load but sometimes it can be count into lighting power. I wonder is there a good way to treat task light?
Option 3: Determining HC and NOx emissions
EBOM-v4 SSc5:Site managementposted by Michelle Raigosa on
Although an Equipment Emissions Reduction Calculator is provided, how do we address maintenance vehicles used on site?