Forum quick links
metal wall louvers
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
In the building that I’m modeling there are metal wall louvers. Some of them are connected to ductwork (for ventilation), some of them ventilate directly technical rooms.
Assigning credits and tasks in the new LEED Online
posted by WSP Built Ecology on
Hi there! Do you know how you can assign specific people to specific credits in the new LEED Online? I've worked out how to add project members but how do you link them to a specific credit?
Can you pursue LEED CI without any plumbing work?
Retail-CI-v2009 WEc1:Water use reductionposted by Karl Heitman on
If a tenant in our LEED NC Certified building wants to pursue LEED CI but doesn't have any plumbing work due to all bathrooms and process water included in LEED NC, how to you comply for WEp1?
LEED NC 2009 EAc5 Measurement and Verification
NC-2009 EAc5:Measurement and Verificationposted by Jim Gardler on
We have developed a M&V plan for a mixed use Multi tenant high rise with commercial space in the building with the International Performance Measurement and Verification Protocol (IPMVP) as the
Location of Parking Lot
Pilot-Credits PC14:Walkable Streetsposted by Walter Parks on
We are developing an existing Historic building. The building and parking are already set up on the site and the parking lot is on the side of the building but fronts on the street.
Marking credits as Complete
posted by kelly ryan on
I am having difficulty with marking credits as complete. The forms have been filled out and meet the compliance. When in the scorecard page, I click on the Complete icon and nothing happens.
EBOM Credit MRp2 Solid Waste Management Policy
NC-2009 IDc1:Innovation in Designposted by Sara Goenner Curlee on
I am working on a NCv2009 project, and it is considering using MRp2 Solid Waste Management Policy as an Innovation Credit. I have a two part question.
Adding credits after Precertification Final Review
posted by Tracy Baker on
I need some clarity on this item. I am working on a LEED CS 2009 project. We have already had our Precertification Preliminary Review. I'm ready to submit for Precert. Final Review.
Hot Humid, Multi Family Compliance
Mid-Rise-v4 EQp1:Ventilationposted by Jason Biondi on
Will direct kitchen exhaust be required for multi family, hot/humid, mid rise projects, pursuing the natural ventilation approach to compliance with IEQ Ventilation prereq.? Best regards Jason
EAc1 error on template
NC-2009 EAc1:Optimize Energy Performanceposted by LEED Pro Consultant on
Hello! I am having problems with the EAc1 template. The EAp2 and EAc1 reports 2 points for a 12.3% savings of a Major Renovation.