Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Radiant Temperature

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  John Lee  on 

What can be considered as a Radiant Temperature control? Do blinds or curtains count if occupant is within 20 feet from the window?

1
Fri May 2, 2014, 6:05 pm

SSC4 LEED EB:OM 2009 Alternate Transportation

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Saum Nour  on 

If you survey building with 3000 multi-tenants, the individuals absent or on jury duty or telecommuting cannot fill out the response. Do you go with National Labor Statistics?

1
Tue Jul 15, 2014, 12:26 am

SSC4 Transportation Rule 2202

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Saum Nour  on 

In one question: If ride share and van pool adds up to 87. However, in another question, the number of ride shares 2, 3, 4, 5 is 112. Do you go with 87 and ignore the 112?

1
Tue Jul 15, 2014, 12:24 am

IPM - Hospitality Industry

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Nate Gillette  on 

All - I am working a five-star resort on a small island. What is used for landscaping is nearly all least toxic (the one that isn't - we think we can replace).

1
Sun Apr 27, 2014, 11:08 pm

SRI equal to Light Reflectance Value (LRV) ?

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Nicole Isk  on 

Whe have problems to get SRI-values for parking deck coatings. Sto says on their website that the Light Reflactance Value (LRV) can be used to calculat the SRI-value.

1
Tue Apr 29, 2014, 3:00 am

Showers mixed office/retail building

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Charles Nepps  on 

I received a comment back from the GBCI saying that the compliance with regards to bike racks and showers must be demonstrated, independently, by each type of space.

0

Storage area for Group Certification

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  FABIO VIERO  on 

Hi, I'm now working on a Group Project certification under LEED 2009 NC. The Group is made of 3 separate buildings with a common basement dedicated to parking use. We're planning to locate the recy

1
Fri Jul 25, 2014, 4:12 am

Floor Coatings and CA Health Dept Compliance

CI-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Michelle Rosenberger  on 

I have a project that is not pursuing EQcr4.3, but is pursuing EQcr4.1 and EQcr4.2. There is a floor coating they would like to use that is compliant with CA Health Dept 1350 requirements.

1
Tue Apr 29, 2014, 7:09 pm

Re-Use of process heat

NC-2009 EAp2:Minimum Energy Performance
posted by  Edwin van Eeckhoven  on 

When residual process heat is used to heat the building, which is more efficient than discarding it, can this be rewarded in EAP2/c1?

1
Wed Apr 23, 2014, 12:56 pm

Performance Period Extension, Post-Reviewer's Comments

Performance Period
posted by  Sara Zoumbaris  on 

Hi All, I am working on a project that has received it's initial reviewer comments.

1
Thu Mar 24, 2016, 10:41 pm