EAp2 Labeling Mechanical Equipment

NC-2009 EAp2:Minimum Energy Performance
posted by  Ian McCall  on 

Hello, Fact or Fiction: For EAp2 ASHRAE 90.1 §6.4.1.5.1 all mechanical Equipment must have a Label installed by the manufacturer stating that the equipment complies with the requirements of Standa

1
Fri Mar 7, 2014, 6:08 pm

how to execute calculation if balcony exist?

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Shenhao Li  on 

Hi, Guys I have a residential project, each housing unit has a balcony in front of side window of the living room, should i need to consider shading impact of balcony when using OPTION 2.

1
Mon Mar 10, 2014, 12:32 pm

Survey alternative : counting vehicles

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Matthieu Delegrange  on 

Hi, My project is an office tower near Paris in France.

1
Thu Mar 10, 2016, 1:09 am

IEQ 4.4 - URGENT

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Al Shadid  on 

All of our adhesives contain no added urea formaldehyde, however our wooden doors contain the following:

1
Mon Mar 10, 2014, 2:42 pm

24-hour lighting

NC-2009 EAp2:Minimum Energy Performance
posted by  Bill Swanson  on 

I looked thru all 2000+ comments and didn't see this addressed. I have a hotel project with a pool, fitness room, vending/ice machines, ect.

1
Mon Mar 10, 2014, 7:05 pm

Loading Dock

EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Control
posted by  David Wood  on 

I had a question in regards to loading dock.

1
Tue Mar 11, 2014, 5:47 pm

LPB for underground parking area shared between several projects

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Kent Liu  on 

I am currently defining LPB for 3 different LEED projects under the same developer.

1
Tue Mar 11, 2014, 2:59 am

Multiple buildings, common basement

LEED Rating System Selection
posted by  Katherine Mariano  on 

Hi, We have a BPO project that wants to be certified but the case is that it shares a common basement with a retail and a hotel.

0

Qualification for LEED CS vs. NC

ND-v2009 PIf1:Development Program and Site Type
posted by  Jin Yang  on 

Hi Eliot, The master planning project consists of two parcels with three highrise buildings.

0

Project Type and Rating Type for Block Project

General forums
posted by  Jin Yang  on 

I working on a master planning development consists of two parcels with three highrise buildings intended for highend administrative offices.

1
Sun Apr 6, 2014, 3:55 am