Forum quick links
EAp2 Labeling Mechanical Equipment
NC-2009 EAp2:Minimum Energy Performanceposted by Ian McCall on
Hello, Fact or Fiction: For EAp2 ASHRAE 90.1 §6.4.1.5.1 all mechanical Equipment must have a Label installed by the manufacturer stating that the equipment complies with the requirements of Standa
how to execute calculation if balcony exist?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Shenhao Li on
Hi, Guys I have a residential project, each housing unit has a balcony in front of side window of the living room, should i need to consider shading impact of balcony when using OPTION 2.
Survey alternative : counting vehicles
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Matthieu Delegrange on
Hi, My project is an office tower near Paris in France.
IEQ 4.4 - URGENT
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Al Shadid on
All of our adhesives contain no added urea formaldehyde, however our wooden doors contain the following:
24-hour lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Bill Swanson on
I looked thru all 2000+ comments and didn't see this addressed. I have a hotel project with a pool, fitness room, vending/ice machines, ect.
Loading Dock
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by David Wood on
I had a question in regards to loading dock.
LPB for underground parking area shared between several projects
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Kent Liu on
I am currently defining LPB for 3 different LEED projects under the same developer.
Multiple buildings, common basement
posted by Katherine Mariano on
Hi, We have a BPO project that wants to be certified but the case is that it shares a common basement with a retail and a hotel.
Qualification for LEED CS vs. NC
ND-v2009 PIf1:Development Program and Site Typeposted by Jin Yang on
Hi Eliot, The master planning project consists of two parcels with three highrise buildings.
Project Type and Rating Type for Block Project
posted by Jin Yang on
I working on a master planning development consists of two parcels with three highrise buildings intended for highend administrative offices.