Forum quick links
Floor Area for Daylight
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Mark Garber on
Can the floor area under built-in casework composed of base cabinets and overhead cabinets be excluded from the floor area using the prescriptive option for sidelighting daylight calaculations for
Transient minimums or calculations for barracks
NC-2009 PIf3:Occupant and Usage Dataposted by Lew Bonadies on
Typically we submit 0 transients (visitors) for our Army barracks LEED NC projects. This has been challenged by the reviewer. Are there "minimums" expected for transients, even on an Army base?
cut stone floor
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Florinda Garcia on
The cut stone floor proposed for the project, will have a pore and non-slip treatment, with this treatment after the instalation in the project, has to comply with floorscore or is exempt and only
Unit of the NonPotable Water Usage
NC-2009 WEc1:Water Efficient Landscapingposted by Omar Elrawy on
Dear all, I'am using HVAC condensate water for landscape irrigation, with an average rate of 8 gpm, in need to know in what units should I document that?
Gathered information for the whole project
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Tanja Arnesson on
I'm working on a project in Sweden containg a concert hall, congress and hotel in the same building on around 645 000 sf.
Apparatus Bay Flush out
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Richard Naldrett on
We have a Fire Station project scheduled for a flush out of the Appratus Bay. The space has heating but there is not a simple way to control humidity.
Core landlord space
NC-2009 PIf2:Project Summary Detailsposted by Mike D on
A potential CI project has a core in the middle of the space, which is not part of the project but belongs to the landlord. No work will be done there.
LEED CI Retail withour glass wall in the mall
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Jatuwat Varodompun on
Can the retail shop in the large shoping mall (conditioned) without the glass enclosed door and wall (the space is connect to the conditioned corridor+atrium) pursue LEED-CI retail? If yes, what s
Can I contribute cork to multiple credits (MRc4 and MRc6)?
Schools-2009 MRc6:Rapidly Renewable Materialsposted by Ricardo Sá on
If my cork product has recycled content and rapidly renewable, can I use it to contribute for both of them?
Equipment not certified by AHRI but with the same efficicency
NC-2009 EAp2:Minimum Energy Performanceposted by jorge calderon on
In the plase of construction i have an HVAC equipment not certified by AHRI.