Floor Area for Daylight

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Mark Garber  on 

Can the floor area under built-in casework composed of base cabinets and overhead cabinets be excluded from the floor area using the prescriptive option for sidelighting daylight calaculations for

1
Mon Sep 30, 2013, 12:50 pm

Transient minimums or calculations for barracks

NC-2009 PIf3:Occupant and Usage Data
posted by  Lew Bonadies  on 

Typically we submit 0 transients (visitors) for our Army barracks LEED NC projects. This has been challenged by the reviewer. Are there "minimums" expected for transients, even on an Army base?

1
Tue Nov 5, 2013, 5:21 pm

cut stone floor

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Florinda Garcia   on 

The cut stone floor proposed for the project, will have a pore and non-slip treatment, with this treatment after the instalation in the project, has to comply with floorscore or is exempt and only

1
Wed Sep 18, 2013, 5:54 pm

Unit of the NonPotable Water Usage

NC-2009 WEc1:Water Efficient Landscaping
posted by  Omar Elrawy  on 

Dear all, I'am using HVAC condensate water for landscape irrigation, with an average rate of 8 gpm, in need to know in what units should I document that?

1
Sun Nov 3, 2013, 6:42 pm

Gathered information for the whole project

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Tanja Arnesson  on 

I'm working on a project in Sweden containg a concert hall, congress and hotel in the same building on around 645 000 sf.

1
Wed Sep 18, 2013, 2:00 pm

Apparatus Bay Flush out

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Richard Naldrett  on 

We have a Fire Station project scheduled for a flush out of the Appratus Bay. The space has heating but there is not a simple way to control humidity.

1
Wed Sep 18, 2013, 3:41 pm

Core landlord space

NC-2009 PIf2:Project Summary Details
posted by  Mike D  on 

A potential CI project has a core in the middle of the space, which is not part of the project but belongs to the landlord. No work will be done there.

1
Fri Sep 20, 2013, 3:51 pm

LEED CI Retail withour glass wall in the mall

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Jatuwat Varodompun  on 

Can the retail shop in the large shoping mall (conditioned) without the glass enclosed door and wall (the space is connect to the conditioned corridor+atrium) pursue LEED-CI retail? If yes, what s

1
Tue Nov 5, 2013, 3:48 pm

Can I contribute cork to multiple credits (MRc4 and MRc6)?

Schools-2009 MRc6:Rapidly Renewable Materials
posted by  Ricardo Sá  on 

If my cork product has recycled content and rapidly renewable, can I use it to contribute for both of them?

1
Wed Sep 18, 2013, 5:38 pm

Equipment not certified by AHRI but with the same efficicency

NC-2009 EAp2:Minimum Energy Performance
posted by  jorge calderon  on 

In the plase of construction i have an HVAC equipment not certified by AHRI.

1
Wed Sep 18, 2013, 6:22 pm