Forum quick links
Core performance path
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Jatuwat Varodompun on
We plan to option 1 equipment efficiency. 1 We have 500,000+ Btu/h VRF compressor which is specified in CEE Tier two as "NA".
BREEAM and LEED
posted by Younha Rhee on
I am currently working on multiple BREEAM projects and there are many international clients who would like to pursue both if pursuing LEED can become easier with the documentation done for BREEAM.
Natural Ventilation in Baseline?
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
In environments where they will be covered by natural ventilation, how should I proceed in baseline model? For example, a factory or warehouse with the proposed natural ventilation, must be equal
SSc6.2 in urban areas
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by BH . on
Hi, there is a sentence in LEED Reference Guide which makes me really confused (page 103): “For existing sites with greater than 50% imperviousness, structural techniques may include restoring a
District Energy Systems
NC-2009 EAc1:Optimize Energy Performanceposted by Matt Humphreys on
I have project that is purchasing chilled water from the local utility.
LEED CI - Scope of work required
NC-2009 PIf1:Minimum Program Requirementsposted by Michael Smithing on
Is there any requirement in the LEED CI MPRs (which I have not found) that a tenant space actually undergo modification to be certified?
LEED Scorecard Forms
posted by Clara Simon on
Thanks for the link to the 2009 scorecards. Can you please provide a link to past scorecards?
SSc6 - Site Improvement Plan
EBOM-v4 SSc6:Site improvement planposted by Levi Jimenez on
Our clients facility is exploring avenues to improve the site to comply with this credit, but is in a dense urban area (Oakland, Ca) and the landscaping on the site itself can not undertake any fur
LEED Scorecard Forms
posted by Clara Simon on
I am attempting to post on the UW's website a consistent appearance of the scorecards earned on UW LEED projects, so that I can provide a link on each project http://f2.washington.edu/cpo/sustain/l
Repealed?
Pilot-Credits PC14:Walkable Streetsposted by Kath Williams on
If a pilot credit is repealed (under Resources, it says March 2013), does that mean a project can not submit this credit even if the project is registered for the credit?