Forum quick links
WEp1 - Existing tenant space conditions
CS-2009 WEp1:Water Use Reductionposted by Todd Bundren on
I am working on a CS existing building renovation project. There are existing toilet rooms on the floors that are "tenant controlled".
Subleased Parking Stalls
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by Alexis Thompson on
I'm working with a project that has 2 levels of parking underground (apprx 160 stalls) and an additional small surface lot that is less than half shaded/covered (apprx 30 stalls).
Aerosol Adhesives
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Martha Norbeck on
I am at a loss for the comments made by our LEED reviewer about an aerosol adhesive. The product is a general purpose mist spray aerosol adhesive with a VOC content of 53.2% by weight.
Club Chairs in hallways for convenience
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Kathryn West on
What about 2 chairs in a hallway? would this be a "multi occupant space" or excluded from the credit requirements?
Energy Star Appliances
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Saju Varghese on
Can savings be reflected on the energy model due to use of energy star appliances?
Systems Narrative
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Kendrick Stalnaker on
For the systems narrative I have the rooftop unit operations broken down as well as the variable air volume boxes.
WOC Diplomat Series Walk Off Carpet
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Erin Nuckols on
Hello, We are planning to use the WOC Diplomat Series walk-off carpet. The product specs indicate that it meets the criteria for IEQc5 because the installation is semi-permanent.
Multiple or Single Zone?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Esteban Martinez on
Hello everybody We are working on a CI 2009 Office project with dedicated Fan Coil Units for each space. The FCU are located above the ceiling (inside the plenum).
Multiple or Single Zone?
CI-2009 IEQp1:Minimum IAQ Performanceposted by Esteban Martinez on
Hello everybody We are working on a CI 2009 Office project with dedicated Fan Coil Units for each space. The FCU are located above the ceiling (inside the plenum).
Scheduling of Building Flush out for LEED Core and Shell Project
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Sangmin An on
Hello, I have a few questions in connection with SCHEDULING of IAQ Management Plan.