ASHRAE Mandatory Requirement 6.4.3.4.3
CS-2009 EAp2:Minimum Energy Performanceposted by Jorge Torres-Coto on
I have a multi-story building that has one AHU per floor taking OSA from a common vertical shaft.
Coating - SRI
CS-2009 SSc7.2:Heat Island Effect—Roofposted by SW LEE on
Is paint or coating with proper tested SRI standard can earn this credit?
Alternative Daily Cover
CI-2009 MRc2:Construction Waste Managementposted by Lawrence Lile on
We are building a maintenance facility at a landfill. It would be very easy to use excavation material as Alternative Daily Cover, as the area that uses this is very close.
Moving Compost
CI-2009 MRc2:Construction Waste Managementposted by Lawrence Lile on
Soil is generally not allowed to be included in waste diversion calculations. But what if we are moving compost?
Instantenous electric water heaters
NC-2009 EAp2:Minimum Energy Performanceposted by Adam Rustige on
Hello, The model I'm working on has instant electric water heaters, per 90.1 7.4.2 Equipment Efficiency, "Equipment not listed in Table 7.8 has no minimum performance requirements." Electr
Option #3 is added to EAc5 M&V
NC-2009 EAc5:Measurement and Verificationposted by Genko Ganev on
I would like to find out what are the requirements for achieving EAc5 - Option #3? Where can I find information to read on MPR #6? and What is :" Option 1 in Pl Form1? Thank you very much
Fresh air from different AHUs for the same room
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Shadi Sobh on
hi all, An existing case were the floor is feed by two (2) variable AHU’s, and a specific room is supplied via two (2) VAVs and each VAV is connected to a different AHU; while calculating the fre
Comprehensive waste reduction program
NC-2009 IDc1:Innovation in Designposted by Magda Aghababyan on
If a manufacturing plant decides to do a comprehensive waste stream audit for its entire manufacturing process and implement a waste reduction plan will it be considered as an innovation credit? T
Stormwater to public rainwater channel that is connected to sea
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Lise Dannesboe on
Our building is connected to a public rainwater channel which is placed out of the LEED boundary, the rainwater channel is connected to the sea.
Defining "Footprint" when the Building is on a slope
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Amit Ahiel on
Our project is on a sloped site so the main entry (we call it "ground floor") in above another entry point where part of the building is embedded in the earth.