Can we go for enhanced commissioning after start of operation

NC-2009 EAc3:Enhanced Commissioning
posted by  Abdulrahman Sherazy  on 

Our client have decided suddenly to go for enhanced commissioning. The construction is complete and the building starts to operate. The fundamental commissioning has been already done.

1
Tue Jun 11, 2013, 6:17 pm

Terminology Clarification?

CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  John Nichols  on 

Hello, I have two questions related to the terminology used in this credit: 1) Could someone help clarify what is meant by the phrase "designed to work in concert" within the Credit Requirements?

1
Tue Jun 11, 2013, 6:54 pm

Exceptional Calculations

NC-2009 EAp2:Minimum Energy Performance
posted by  Stephen DeGrazio  on 

I have a new bubilding which will be mostly a performing arts theater and school gymnasium.

1
Wed Jun 12, 2013, 5:57 pm

Construction Documents

General forums
posted by  Scott Robb  on 

Where would the best place be to locate a comprehensive set of "standard" LEED contract documents. I am talking about "New Construction" and "Commercial Interiors".

0

NDPp3 and a Campus Project

ND-v2009 NPDp3:Connected and open community
posted by  Steven Velegrinis  on 

Hi, I am inquiring generally about LEED ND's applicability to the project and specifically on NPDp3.

1
Wed Jun 12, 2013, 10:11 pm

Private Bus

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Alicia Freire  on 

Hello, I am working on a project where we are trying to follow the route of the private bus and I was wodnering if anyone would know what documentation will we need to provide to demonstrate compl

1
Wed Jun 12, 2013, 2:43 pm

Normalizing Baseline

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Timothy Casper  on 

Given our unique project conditions we are pursuing this credit via Case 2, Option 2B.

1
Tue Aug 6, 2013, 4:23 pm

Normalizing the Baseline

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Timothy Casper  on 

Given our unique project conditions we are pursuing this credit via Case 2, Option 2B.

1
Fri Jun 21, 2013, 1:28 am

Non-densely occupied spaces without airflow measurement device

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Mike D  on 

Do all the spaces come into account for this credit?

1
Mon Jul 1, 2013, 5:51 pm

Other routes for airflow measurment devices

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Mike D  on 

Are there any other ways of achieving the credit for non-densely occupied spaces using another route than airflow measurement devices ?

1
Mon Jul 1, 2013, 5:48 pm