Forum quick links
purchased heat pumps for ASHRAE 90.1
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
Dear Group, As you know additional requirements from LEED led to purchased heat water coils being substituted for furnis heat coils in some unitary systems.
Upper and lower roof
Healthcare-v2009 SSc7.2:Heat island effect - roofposted by BABAR MEHMOOD on
There is a small pump room designed on the roof top.
greenfield or previously developed land?
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Adi Negara, LEED AP BD+C on
Can anybody tell me in what category does the paddy (rice) field would fall under?
U-Factor for Vertical Fenestration
NC-2009 EAc1:Optimize Energy Performanceposted by TOMAS URIBE on
Hello, We are wondering if it is possible to perform a detailed simulation using the LBNL (Lawrence Berkeley National Lab) Windows Software to comply with the Fenestration Assembly U-Factor. Than
Selecting baseline for mixed use building
NC-2009 EAp2:Minimum Energy Performanceposted by Lavanya Veerappa on
We are working on a project which is mixed use facility (6 storey/G+5) . The first & 2nd floor is used for office & remaining for residential.
EA 5,1
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Muhammad Faisal Azizullah Jaffar on
We are working on a mall project going ahead with the LEED CS GOLD.We are currently on tender stage and the client has suddently come up with the LEED requirement.
Case 2 Calculator - Space Types
EBOM-2009 EAc1:Optimize Energy Performanceposted by Timothy Casper on
Our project is a mixed use building used by community groups and has several different space types within it (theater, classrooms, event areas, kitchen, offices).
Projects outside the U.S.
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Stefanie Hoffmann on
Dear all, Having worked on a LEED EBOM project in Helsinki, Finland, where we were unfortunately not able to fulfill one of the prerequisites (EAp2), motivated me to dedicate my bachelor's thesis t
Projects outside the U.S.
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Stefanie Hoffmann on
Dear all, Having worked on a LEED EBOM project in Helsinki, Finland, where we were unfortunately not able to fulfill one of the prerequisites (EAp2), motivated me to dedicate my bachelor's thesis t
Temporary carpets / rugs
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Maya Karkour on
Hello, Do roll-out carpets / rugs usually used in residential apartments need to be certified?