Does casework count for MR4, MR5 and MR7?
Schools-2009 MRc7:Certified Woodposted by Caroline Kilbane on
Casework is specified under division 12 of the CSI spec format, similar to loose furnishings. Does that mean we can and should exclude it from the calculations for the MR credits?
last minute
posted by Bill Swanson on
Just a warning to people who wait to the last minute for things.
JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll)
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Michelle Bracewell-Musson on
Hello, Due to where the building is located (between fields), it seems we need to have these bait blocks (placed outside the buildings) used continuously or there is a problem.
3 month performance period vs. Construction
posted by Karin Wohlert on
It seems that if a credit could be applicable to part of a construction renovation the performance period should include construction (and as a result the performance period is more than 3 months).
HCFC123 or HFC410A
NC-2009 EAp3:Fundamental Refrigerant Managementposted by edward deschapell on
On a new construction project which is the better way to go when installing a new chiller? A chiller with HCFC or HFC? Thanks
Parking space separate problem
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Nan ZHANG on
Dear all, Our project is a synthesized building with office, shopping mall and residence. Only the part of the office will apply for the LEED certification.
Within Boundary-Consider only 1 service&shud be open to public?
NC-2009 SSc2:Development Density and Community Connectivityposted by Muna Akheel on
“For mixed-use projects, no more than 1 service within the project boundary may be counted as 1 of the 10 basic services, provided it is open to the public.” 1. Does this mean that only 1 service
infill site
ND-v2009 SLLc8:Restoration of habitat or wetlands and water bodiesposted by Cardy V on
Hi Eliot, Is this credit achievable if the site is located in a previously developed site? what if the developer introduce native plants, which will enhance wildlife habitat?
LEED Project Boundary for a Train Station
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michael G on
Hi all, I have an issue properly defining the project boundary for a Train Station on a large overall site which includes the station, outdoor plaza, train platforms, large parking lots, a substati
When to submit for construction Review
posted by Jon Quigley on
Hello, My project is ready for construction review in terms of credits being completed but the project is still currently under construction. Can i still submit now?