Does casework count for MR4, MR5 and MR7?

Schools-2009 MRc7:Certified Wood
posted by  Caroline Kilbane  on 

Casework is specified under division 12 of the CSI spec format, similar to loose furnishings. Does that mean we can and should exclude it from the calculations for the MR credits?

1
Thu May 23, 2013, 8:34 pm

last minute

General forums
posted by  Bill Swanson  on 

Just a warning to people who wait to the last minute for things.

0

JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll)

EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Management
posted by  Michelle Bracewell-Musson  on 

Hello, Due to where the building is located (between fields), it seems we need to have these bait blocks (placed outside the buildings) used continuously or there is a problem.

1
Thu Jun 6, 2013, 2:38 pm

3 month performance period vs. Construction

Performance Period
posted by  Karin Wohlert  on 

It seems that if a credit could be applicable to part of a construction renovation the performance period should include construction (and as a result the performance period is more than 3 months).

1
Fri Oct 11, 2013, 2:27 am

HCFC123 or HFC410A

NC-2009 EAp3:Fundamental Refrigerant Management
posted by  edward deschapell  on 

On a new construction project which is the better way to go when installing a new chiller? A chiller with HCFC or HFC? Thanks

1
Mon Nov 4, 2013, 2:14 am

Parking space separate problem

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Nan ZHANG  on 

Dear all, Our project is a synthesized building with office, shopping mall and residence. Only the part of the office will apply for the LEED certification.

1
Thu Sep 19, 2013, 7:45 am

Within Boundary-Consider only 1 service&shud be open to public?

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Muna Akheel  on 

“For mixed-use projects, no more than 1 service within the project boundary may be counted as 1 of the 10 basic services, provided it is open to the public.” 1. Does this mean that only 1 service

1
Fri May 24, 2013, 3:41 pm

infill site

ND-v2009 SLLc8:Restoration of habitat or wetlands and water bodies
posted by  Cardy V  on 

Hi Eliot, Is this credit achievable if the site is located in a previously developed site? what if the developer introduce native plants, which will enhance wildlife habitat?

0

LEED Project Boundary for a Train Station

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Michael G  on 

Hi all, I have an issue properly defining the project boundary for a Train Station on a large overall site which includes the station, outdoor plaza, train platforms, large parking lots, a substati

1
Tue Nov 5, 2013, 4:43 pm

When to submit for construction Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Jon Quigley  on 

Hello, My project is ready for construction review in terms of credits being completed but the project is still currently under construction. Can i still submit now?

1
Tue May 28, 2013, 12:31 pm