Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Submitted drawings

NC-2009 PIf4:Schedule and Overview Documents
posted by  Ashley Sadowski  on 

I have a general question regarding submitted drawings. We are at 100% DD's and wanted to create the documentation for the sustainable sites criteria.

1
Wed Aug 14, 2013, 10:06 pm

Do we have to include unconditioned spaces in the 3D model?

NC-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Dear All, I want to model a school project with 3 unconditioned basement floors hosting a car park. Do we really need to draw these spaces in the 3D model of the simulation, or can we just calcul

1
Tue May 14, 2013, 1:09 pm

Water Efficient Landscaping

NC-2009 WEc1:Water Efficient Landscaping
posted by  Sundararaj Subburaman  on 

Am working with a project on LEED NC version 2009 which is located in Melaka, Malaysia.......... I have a doubt in species factor for Axonopus compressus.... Whether i can consider Cow grass ( Ax

0

Wood Chip Boiler base case?

NC-2009 EAp2:Minimum Energy Performance
posted by  Allison Zuchman  on 

This is a question from a non-energy modeler looking for some guidance on base case vs. design case for a LEED energy model that a consultant is working on. The project is a school.

1
Thu May 16, 2013, 4:57 am

About carpool parking facilities.

ND-v2009 NPDc5:Reduced parking footprint
posted by  Maria Isabel Conde  on 

We really need to meet the ratio of 1 for every 10 car parking spaces for carpool (10%)?. These should be separate or together?.

1
Tue May 14, 2013, 5:42 pm

Spoil Area

NC-2009 PIf2:Project Summary Details
posted by  Ashley Sadowski  on 

I am working on a large dormitory project which requires a "spoil area" on an adjacent lot which accommodates the excess soil in the cut/fill process of regrading the site.

1
Tue May 14, 2013, 9:50 pm

Envelope test

NC-2009 EAp2:Minimum Energy Performance
posted by  Kenneth Bailey  on 

In a multiple building project we have 100 identical staff housing units that need to comply with AHRAE for EAP2. Must we test each and every building and can we do a % of them?

1
Thu May 16, 2013, 5:04 am

Unusual FTE

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Erin Nuckols  on 

Hello, I am working on a residence hall and we have a total of 12 FTE, 3 Transients, and 654 residence.

1
Wed Jul 31, 2013, 4:16 pm

Outdoor Pool

NC-2009 EAp2:Minimum Energy Performance
posted by  Chet Knaup  on 

Hey, I have a Multi-Story Office building that is looking to achieve 19 points by purchasing PV Panels to offset the energy consumption.

1
Thu May 16, 2013, 5:09 am

Signage

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Jessica Garcia  on 

It's not clear to me what I have to upload onto the form for option 1.

1
Mon May 20, 2013, 4:53 pm