Forum quick links
Can Exterior Plantings count in MRc6?
Schools-2009 MRc6:Rapidly Renewable Materialsposted by Cheryl Dieso on
We have a Science & Math HS Building under construction and have come up short with our rapidly renewable products. We are investigating various approaches in order to meet this credit.
Pilot Credit 10
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Alicia Villanueva on
Hallo, My team and I have reduced water use in a project through high-efficient flush fixtures by 39%. In addition, 100% of the water used for sewage conveyance is treated on-site to tertiary stand
ID Credit for using building envelope material
NC-2009 IDc1:Innovation in Designposted by JOSE R. TAGLE on
Could I apply for an ID credit for using a totally inorganic, crushed glass and absolute closed celled material from building envelope.
Maximum distance to facilities?
NC-2009 MRc2:Construction Waste Managementposted by Reid Middlebrooks on
We have a project in a small town that is very remote. The nearest recycling facilities are 150 miles away by rail or truck. Another option is 1,500 miles by barge.
Cabins at a summer camp?
posted by Patty Breech on
I have a unique project that involves building 5 stand-alone cabins as part of a summer camp.
Does a Real Estate Tax is
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Joseph Goldstein on
Does a Real Estate Tax is proof of ownership?
California Title 24-2005 Part 6 vs. ASHRAE 90.1-2007
NC-2009 EAp2:Minimum Energy Performanceposted by Erica Suarino on
It's clear from the credit language and LEED Online form that California Title 24-2005 Part 6 can be used in place of ASHRAE 90.1-2007 as a baseline when creating an energy model.
Major renovation, model rotation
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
If a project is being demolished but the slab and some columns are being kept, would that be considered a major renovation since we are not given the option of redesigning the orientation of the bu
Waiver for Quantity Requirement
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Tim Setala on
We have a project where infiltration is not possible as the soils are D type.
Chiller
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Saju Varghese on
Should the chiller be considered part of the commisioning and M&V metering even if it's serving other tenants as well?