Forum quick links
invidually buildings ceritifcation vs multiple buildings/ campus
posted by Muhammad Faisal Azizullah Jaffar on
My project is based in Qatar and the total site area is around 13,000748 m2 of GFA comprising of 10,654 sqm of retail, 78,563 sqmof commercial office space including, 132sqm of atrium circulation,
unknown VOC
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Anna Ohlmeier on
I am working on an acutal project. We have a product (polyurethan silicone, which already is in use) with an unknown VOC content.
leed cs or leed retail ?
posted by shashank jain on
For the Retail projects, specifically shopping malls, where developer aims to sublet all retail units to prospective tenants and effectively will not have the control over their fit-out, or a very
What to consider as toilet accessories?
NC-2009 MRc4:Recycled Contentposted by Marcio Alberto Casado Pereira on
CSI Section 10 is included in this credit. What would be considered toilet/bath acessories under CSI 10 28 00?
MPR#6 - Option 1: Sharing data via Energy Star Portfolio Manager
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Ron Dean on
One of the projects I'm working on in Peru, is persuing the option 1 of MPR#6 (through Energy Star Portfolio Manager:ESPM) so we can get one EP point in EAc5.1. So, my questions are: 1.
Major Renovation Requirements
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
When a project would be classified under Major Renovation (our project is around 80% renovated) for the energy model, does the baseline have to be the same as Ashrae 90.1 envelope requirements or c
Smoke & Acoustic Sealant
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Giancarlo Perossa on
Does anyone know what category Smoke & Acoustic Sealant would fall under? I didn't find it listed in SCAQMD Rule 1168 and the categories in the LEED manual are a bit generic.
Required Section Views
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Matthew Macko on
Do we need to include section views with lines of sight drawn from 42" aff to perimeter glazing for every single regularly occupied space within the building, or are the section views only for spac
Greywater recirculated
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Mike D on
Our water reduction due to fixtures and fittings only is 38%. We have recirculating greywater in the project that will be recirculated to toilets. This will bring our reduction to 42%.
low emittig count for green vehicles?
Pilot-Credits LTpc70:Green vehiclesposted by Albert Sagrera on
Hi, we are trying to achieve this pilot credit, and we doubt if the prefered spaces already reserved for credit SS4.3 for low emitting and fuel efficient vehicles could be counted also for the comp