Forum quick links
Electric furniture
CI-2009 MRc5:Regional Materialsposted by Mathilda Jonsson on
Hi all I'm wondering about electrical supplies for some furniture, i. e height-adjustable work desks. Are these electrical components also included in the regional requirement?
MULTIPLE BUILDINGS CONNECTED AS ONE.
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Daniel Rohe on
I am trying to put together a water fixture inventory and calculations for an office complex that has three buildings built in different years that are attached as one building.
Sorting Cactus
NC-2009 WEc1:Water Efficient Landscapingposted by Omar Elrawy on
I have two questions, Should I categorize Cactus as a tree or as a shrub? Can I set all base-case to sprinkler, then the design case is to be dripping?
LEED Homes vs LEED NC for Dormitory with Faculty Apartments
posted by Timothy Casper on
I am working on a dormitory building at a boarding school that will also include faculty apartments. The student dorms will be comprised of single and double bedrooms.
Cafeteria/Training Room: Regurlarly Occupied Area?
NC-2009 PIf3:Occupant and Usage Dataposted by Silvia Ruiz on
I recently received a LEED Review asking me to include the caferia/training room into the regularly occupied area of my project, claiming that "only support areas such as copy rooms, storage, mecha
Process Loads Description
CI-2009 EAc3:Measurement and Verificationposted by Saju Varghese on
Im trying to find out what would be considered process loads to be metere separately, is there a definition from LEED?
Total Daily Uses: Some unisex bathrooms witout urinals...
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Silvia Ruiz on
Hi, The project I am working on has a bathroom set for women, a bathroom set for men (includes urinals), and two unisex bathrooms without urinals.
Waste water generation and treated water
CS-2009 WEc2:Innovative Wastewater Technologiesposted by Michael E. Edmonds-Bauer on
Our project has a big treatmet plant that is treating to tertiary standards not only blackwater but also graywater. The form automatically draws from the WEp1 the wastewater calculations consideri
DES supplied by CHP
posted by BH . on
Hi I am working on a new development in Warsaw which will b supplied from the district heating system. DES is supplied by CHP which are supplied by biofuels maybe in 10%.
suspiciously high savings in auxillary power
CS-2009 EAc1:Optimize Energy Performanceposted by shashank jain on
high savings in auxillary power Hi we are modelling a 18 storey office block in Sap Paulo and getting some results we wanted to cross check, as we doing the energy model for the first time... Desc