Forum quick links
Logging Sealants / Adhesives on LEED Form
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Catherine Blakemore on
I have some sealants and adhesives that are being submitted under Division 06 and 12. Should they just be listed once on the LEED form chart?
Project of 2 buildings in one territory
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Laurence Theriault on
I am working on a project who has two buildings in his land, but only one of them (an office building) will be in the process of becoming LEED NC.
The new communications protocol will be MUCH smoother
posted by Abena Darden on
This is great news-and it adds to the transparency of who GBCI is. It helps to know our colleagues will be answering some of the most challenging technical questions.
Partial interior fit-out
posted by mariela garate on
I read the comments but couldn't find de tables mentioned above... What if we have an existing small office (less than 1000sf) that is in good shape, and we want to do a partial renovation of the
Commercial kitchen cooling equipment
CS-2009 EAp3:Fundamental Refrigerant Managementposted by Mathilda Jonsson on
There are no refrigerants used in my project building for the HVAC&R-system.
Core&Shell Process Load on a Manufacturing Facility
CS-2009 EAp2:Minimum Energy Performanceposted by Lourdes Salinas on
Hi everyone, We have a C&S Major Renovation Manufacturing Facility project. The building is doubling in size and some adjustments will be performed to the envelope of the existing building.
Documents/ details needed for alternative compliance path
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Mark Meaders on
We have a project with a central plant with chillers that has R-11 refrigerant.
Trace Modeling for Carrier Infinity-V speed heat pumps ??
NC-2009 EAc1:Optimize Energy Performanceposted by Robert Sutton on
Planning to use Carrier variable speed heat pumps split systems on a project and I am looking for data files to assist in this. The manufacturer rep is not aware of anything that can help.
waterless urinals
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Emmanuel Pauwels on
We have tried to comply with this credit using waterless urinals and dual flush toilets with a very low flush (3L/435L)
Existing Parking conditions
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by John Stouffer on
The existing conditions of the site have 55 existing parking spaces. Our plans show that we are taking out 14 parking spaces and adding 16 addition spaces, totaling 71 parking spaces.