Upper limit?

EBOM-2009 EAc2.2:Existing Building Commissioning—Implementation
posted by  American University  on 

I'm wondering if all identified ECMs have to be included in a longer term capital improvement plan OR if the audit revealed a project with, say, a 12 year pay back period and high implementation co

1
Tue Apr 2, 2013, 2:02 pm

CONCRETE MIX REPORTING

CI-2009 MRc5:Regional Materials
posted by  Shane Tohara  on 

We are using 2 seperate concrete mixes on our CI project. A letter from the manufacture details the raw materials and ratios for each mix. Each type of mix is clearly identified on the invoice.

1
Tue Apr 2, 2013, 3:08 pm

Pilot House - Credit 67 Approach

Pilot-Credits EApc67:Energy Jumpstart
posted by  Ryan Pitera  on 

We are using this credit for our certification process after not meeting the minimum Energy Star requirements and it seems to be working out great.

0

SSc4.2 in Multiple Buildings

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Robert Phinney  on 

At a new corporate campus, we are trying to apply the credit for C&S via the multiple buildings options.

1
Mon Nov 4, 2013, 6:21 pm

Bicycle racks and chaging rooms underground

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Michael E. Edmonds-Bauer  on 

Our project is providing the bicycle racks and the showers separately in thre differente levels. A set of 6 bicycle racks are on the underground level 1 A set of 28 bicycle racks and 4 showers are

1
Mon Nov 4, 2013, 6:17 pm

Multiple Buildings: Distance from Showers to Building Entrance

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Michelle DiPenti  on 

We are using the Application Guide for Multiple Buildings (AGMB) to certify 4 buildings (Bldgs 1, 2, 3, & 4) as a Group.

1
Thu Apr 11, 2013, 5:42 pm

EXTRACTION DUCTS AND FANS

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Michael E. Edmonds-Bauer  on 

This might sound obvious, but we wanted to double check. Regarding underground parking encloused parking (no natural ventilation at all), there always will be fans to "push" the air towards the ex

1
Mon Nov 4, 2013, 5:59 pm

Recent Experience

General forums
posted by  Julia Weatherby  on 

Wow, that's great!

1
Mon Apr 8, 2013, 1:37 pm

LEED Reviewer

General forums
posted by  Cassandra Kail  on 

I was told by a colleague that if you have a particularly large or complicated project you could have a specific LEED Reviewer or LEED Support Team member (not sure which she meant) work with you t

1
Wed Apr 3, 2013, 6:02 pm

LEED Retail-CI Restaurant Furniture

CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  Linda Davisson  on 

As there is not yet a place to pose a question for Retail-CI, I am hoping someone might still be able to provide confirmation on our team's approach to documenitng the furniture in our project.

1
Fri Dec 4, 2015, 4:15 pm