Upper limit?
EBOM-2009 EAc2.2:Existing Building Commissioning—Implementationposted by American University on
I'm wondering if all identified ECMs have to be included in a longer term capital improvement plan OR if the audit revealed a project with, say, a 12 year pay back period and high implementation co
CONCRETE MIX REPORTING
CI-2009 MRc5:Regional Materialsposted by Shane Tohara on
We are using 2 seperate concrete mixes on our CI project. A letter from the manufacture details the raw materials and ratios for each mix. Each type of mix is clearly identified on the invoice.
Pilot House - Credit 67 Approach
Pilot-Credits EApc67:Energy Jumpstartposted by Ryan Pitera on
We are using this credit for our certification process after not meeting the minimum Energy Star requirements and it seems to be working out great.
SSc4.2 in Multiple Buildings
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Robert Phinney on
At a new corporate campus, we are trying to apply the credit for C&S via the multiple buildings options.
Bicycle racks and chaging rooms underground
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Michael E. Edmonds-Bauer on
Our project is providing the bicycle racks and the showers separately in thre differente levels. A set of 6 bicycle racks are on the underground level 1 A set of 28 bicycle racks and 4 showers are
Multiple Buildings: Distance from Showers to Building Entrance
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Michelle DiPenti on
We are using the Application Guide for Multiple Buildings (AGMB) to certify 4 buildings (Bldgs 1, 2, 3, & 4) as a Group.
EXTRACTION DUCTS AND FANS
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Michael E. Edmonds-Bauer on
This might sound obvious, but we wanted to double check. Regarding underground parking encloused parking (no natural ventilation at all), there always will be fans to "push" the air towards the ex
LEED Reviewer
posted by Cassandra Kail on
I was told by a colleague that if you have a particularly large or complicated project you could have a specific LEED Reviewer or LEED Support Team member (not sure which she meant) work with you t
LEED Retail-CI Restaurant Furniture
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Linda Davisson on
As there is not yet a place to pose a question for Retail-CI, I am hoping someone might still be able to provide confirmation on our team's approach to documenitng the furniture in our project.