Forum quick links
Responsible party for preparing M&V plan
NC-2009 EAc5:Measurement and Verificationposted by Becky Dix on
What are the pros and cons of having either the MEP engineers or the CxA be responsible for documenting the M&V plan?
Can LEED interpretations be enforced on older LEED versions?
posted by Sandra Bauder on
It is my understanding, that though one can choose to quote a CIR for equal treatment under a specific credit, CIR's do not constitute a formal part of a credit requirement. Specifically, we are pu
Controller efficiency factor (CE)
NC-2009 WEc1:Water Efficient Landscapingposted by Ricardo Sá on
During a certification process I have found an electronic irrigation controller (model Hunter Pro-C) that is equipped also with a rain sensor (model Hunter Rain-Click).
ND standard vs the NC standard
ND-v2009 GIBp4:Construction activity pollution preventionposted by Amanda Tullos on
Any idea how the 2003 EPA Construction General Permit (Phase I and I NPDES) required in LEED-NC compares to the Washing State Department of Ecology's Stormwater Management Manual requirement for th
Radical Simplification
posted by Melissa Wrolstad on
MR credits need to be radically simplified. Below is an example simplification: "Combine MRcr2, MRc3 and MRcr4 into one credit.
Radical Simplification
posted by Melissa Wrolstad on
MR credits need to be radically simplified. Below is an example simplification: "Combine MRcr2, MRc3 and MRcr4 into one credit.
Mini-split efficiency
NC-2009 EAp2:Minimum Energy Performanceposted by Leandro Silva on
We are having trouble verifying the efficiency compliance of mini-split air conditioners available in Brazil. They are rated in COP where ASHRAE requirements are stated in SCOP.
Dedicated exhaust in areas of chemical storage- Janitor's closet
EBOM-2009 IEQc3.1:Green Cleaning—High-Performance Cleaning Programposted by Karin Wohlert on
LEED EBOM does not appear to have any credit that requires direct exhaust areas that store chemicals such as a Janitor's closet might contain.
LEED v2 and Mozilla
posted by Melissa Wrolstad on
How come I can't use LEED Online v2 with Mozilla anymore?
Automated Demand Response
CS-2009 EAp2:Minimum Energy Performanceposted by Ryan McEvoy on
We are working on a project that is participating in automated demand response. Due to EAc1 points being based on cost savings I want to model this appropriately.