posted by  Bill Swanson  on 

Few to none of my comments seem to actually get an answer. I'm trying to be as clear and straight forward as possible and the response I get is a copy/paste answer to a different question.

0

LEED-NC for a residential building

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Michael E. Edmonds-Bauer  on 

We have a residential project that wishes to apply for LEED-NC, due to climate conditions no HVAC system will be implemented and 100% of ventilation will be natural (no mechanical equipment at all)

1
Wed Mar 6, 2013, 3:07 am

Views calculation

CS-2009 IEQc8.2:Daylight and Views—Views
posted by  Mike D  on 

For a CS project, we will show a plan of a typical floor with the layout. However, in the Views calculation spreadsheet do we need to include all floors or is one floor sufficient ?

1
Fri Mar 22, 2013, 1:00 pm

Site disturbance question

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Alicia Villanueva  on 

We have a huge project, if the project site is a greenfield, but it has neither trees nor plants; is it possible to install the "construction camps" outside the building footprint and once the proj

1
Thu Mar 21, 2013, 4:54 pm

Purchasing Green Cleaning Equipment

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Matthew Singer  on 

I would like some clarification as to whether the building itself needs to own the cleaning equipment or can it be owned by the vendor that cleans the building in order to receive the appropriate g

1
Wed Mar 6, 2013, 6:01 pm

handling overflow

ND-v2009 GIBc8:Rainwater management
posted by  Crystal Wu  on 

As per LEED requirements in this credit, up to X percentile rainfall events should be retained on-site, through infiltration, evapotranspiration and reuse, and must not be discharged into surface w

1
Tue Mar 12, 2013, 5:58 pm

Green Cleaning credit achievement rates

EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessment
posted by  stuart carron  on 

Thanks LEEDuser for publishing credit achievement rates - should be very helpful for the industry to address gaps. I find it curious that the achievement rate for this performance monitoring credit

1
Tue Mar 19, 2013, 4:19 pm

ITE Study for use on Residential Projects

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Iris Amdur  on 

Hi, I have a Residential project that is adding new parking and has a local maximum parking requirement but no minimum parking requirement.

1
Wed Mar 20, 2013, 10:44 pm

Integrative process

General forums
posted by  Eddy Santosa  on 

Because I can't comment directly, I just would like to suggest the change on the language for the IPc1.

0

If we go to the option 2 in SSc7.1, do we need SRI>29 for road.

CS-2009 SSc7.1:Heat Island Effect—Nonroof
posted by  Somsak Jidmon  on 

If we are going to go with option 2 of the credit SSc7.1 - puting more than 50% of car parking to under the building structure.

1