Forum quick links
Sustainable Food policy
EBOM-2009 MRc5:Sustainable Purchasing—Foodposted by Lee Ann Walling, LEED AP ND on
Hi we are a state agency and usually aren't able (by law) to provide food for ourselves with taxpayer funds, nor do we have a cafeteria.
minimum outdoor air
NC-2009 EAp2:Minimum Energy Performanceposted by PAWAN DAHIWAL on
Minimum outdoor air shall be model identically in both the cases. I am confused which outdoor air should be taken from either from IEQ baseline or from actual.
Shared parking facilities
Pilot-Credits LTpc70:Green vehiclesposted by Maria García on
Im not sure if in this pilot credit applies that the parking facility is not part of the LEED project construction scope.
I am relatively new to LEED
NC-2009 EAp2:Minimum Energy Performanceposted by le sang on
I am relatively new to LEED and I would like to know if there are systems out there and gain many credits for a new office HQ in IrelandThe other question is related with how to prove a process loa
Vacant Space Critical Zones
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Robert Calloway on
I am working on a building that has multiple floors that are completely stripped and wide open for new tenants to design the layout to.
WE Pr 1 lavatory faucet durations
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Rebecca Molldrem on
Our reviewer has noted in the technical advice that "for projects registered after Feb 2, 2011, a 30 second duration is required for lavatory faucets." We have used either 15 seconds, or 12 second
Contaimination found,but remediation not required per site class
NC-2009 SSc3:Brownfield Redevelopmentposted by Erin Holdenried on
I have a project where some mercury contamination was found, but not enough to require remediation for the intended use as an industrial site. I assume that in order to achieve this credit some so
Flush & Flow Fixture Installations
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Alexis Voeltner on
If our potential project is currently installing flush & flow fixtures, but wants to start the performance period, is it acceptable to enter the new flush & flow rates as long as they are a
Athletic Field included under SSc5.2, but excluded under WEc1?
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Lisa Milano on
There is an existing athletic field within our project's LEED boundary that we would like to include in our calculation for SSc5.2 in order to earn exemplary performance.
Testing Approach
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by J.R. Anderson on
I have a middle school slated to be completed this coming summer. It will be in late July. Each classroom has a dedicated ground source heat pump air handling unit.