Sustainable Food policy

EBOM-2009 MRc5:Sustainable Purchasing—Food
posted by  Lee Ann Walling, LEED AP ND   on 

Hi we are a state agency and usually aren't able (by law) to provide food for ourselves with taxpayer funds, nor do we have a cafeteria.

1
Fri Feb 22, 2013, 2:27 am

minimum outdoor air

NC-2009 EAp2:Minimum Energy Performance
posted by  PAWAN DAHIWAL  on 

Minimum outdoor air shall be model identically in both the cases. I am confused which outdoor air should be taken from either from IEQ baseline or from actual.

1
Wed Feb 20, 2013, 5:00 pm

Shared parking facilities

Pilot-Credits LTpc70:Green vehicles
posted by  Maria García  on 

Im not sure if in this pilot credit applies that the parking facility is not part of the LEED project construction scope.

1
Fri Feb 22, 2013, 4:40 pm

I am relatively new to LEED

NC-2009 EAp2:Minimum Energy Performance
posted by  le sang  on 

I am relatively new to LEED and I would like to know if there are systems out there and gain many credits for a new office HQ in IrelandThe other question is related with how to prove a process loa

1
Thu Feb 21, 2013, 3:05 pm

Vacant Space Critical Zones

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Robert Calloway  on 

I am working on a building that has multiple floors that are completely stripped and wide open for new tenants to design the layout to.

1
Wed Feb 20, 2013, 6:54 pm

WE Pr 1 lavatory faucet durations

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Rebecca Molldrem  on 

Our reviewer has noted in the technical advice that "for projects registered after Feb 2, 2011, a 30 second duration is required for lavatory faucets." We have used either 15 seconds, or 12 second

1
Wed Feb 20, 2013, 5:23 pm

Contaimination found,but remediation not required per site class

NC-2009 SSc3:Brownfield Redevelopment
posted by  Erin Holdenried  on 

I have a project where some mercury contamination was found, but not enough to require remediation for the intended use as an industrial site. I assume that in order to achieve this credit some so

1
Wed Feb 20, 2013, 5:54 pm

Flush & Flow Fixture Installations

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Alexis Voeltner  on 

If our potential project is currently installing flush & flow fixtures, but wants to start the performance period, is it acceptable to enter the new flush & flow rates as long as they are a

1
Thu Feb 21, 2013, 4:39 pm

Athletic Field included under SSc5.2, but excluded under WEc1?

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Lisa Milano  on 

There is an existing athletic field within our project's LEED boundary that we would like to include in our calculation for SSc5.2 in order to earn exemplary performance.

1
Fri Feb 22, 2013, 10:44 pm

Testing Approach

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  J.R. Anderson  on 

I have a middle school slated to be completed this coming summer. It will be in late July. Each classroom has a dedicated ground source heat pump air handling unit.

1
Wed Mar 20, 2013, 11:47 pm