Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Joanna Paull on
I just wanted to check in with all you bright folks about strategies that are on the up and up.
Open space have to be acessible?
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Marcio Alberto Casado Pereira on
We have a big area vegetated with adaptaded species within the LEED Campus Boundary (we have a multiple building situation) that does meet the 1:4 side slope criteria but it is unlikely that the bu
Scored High in Prerequisite
EBOM-2009 EAc1:Optimize Energy Performanceposted by Ryan Gardner on
Hello, my project recieved an Energy Star rating of 95 in the prerequisite stage. We have not identified any cost effetive ways to improve this number.
Access Panel in Hard Lid Ceiling
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Ralph Bicknese on
Our janitor rooms do not have deck-to deck partitions.
Preferred parking spaces
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Emmanuel Pauwels on
We are certifying a tenant space with LEED CI in a building that was previously CS certified. The CS building has preferred parking spaces for electrical vehicles.
Option 2: Scope and EAp2
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Marco Abdallah on
1) Is it possible to pursue option 2 even if all the central HVAC systems are not part of the tenant scope of work? 2) Is it possible to use the simulation (option 2) according Ashrae Appendix G al
McQuay Acoustic Analyzer Program
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by on
My mechanical engineer has a program called "McQuay Acoustic Analyzer Program" but we do not know if the calculations it performs will be acceptable to the LEED reviewers.
Minimum Acoustical Performance in Naturally Ventilated Classroom
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by cristina algaze beato on
Most of our core learning spaces are naturally ventilated.
Recertification Tracking
EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipmentposted by Robin Obaugh on
I have a question concerning Part 1 of the form and how it is to be used for a property that achieved this credit and is in it's 2nd performance period. "Existing Equipment Log": Should the equip
Can you earn SSc1 opt 2 RP credits if only pursing SSc1 opt 1?
CI-2009 RPc1:Regional Priorityposted by Misc User on
We are building a LEED CI space in a LEED EB building and earning 5 points under SSc1 option 1. We qualify for one of the option 2 credits--Brownfield Redevelopment--which is also a RP credit.