Forum quick links
Completing PIF1 when you have an exception to providing meters
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Susan Di Giulio on
We are working on a municipal water processing plant.
option 3 requirements
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Adam Targowski on
Are there any requirements regarding the time of the day when the daylight measurements have to be taken?
Owner's Policy, or Cleaning Contractor's Policy?
EBOM-2009 IEQp3:Green Cleaning Policyposted by Margaret McColl on
Hello, I am working on a project that is owned an occupied by a single company that uses a cleaning contractor. Does the Green Cleaning Policy have to be developed and implemented by the Owner?
Landscape factors
CS-2009 WEc1:Water Efficient Landscapingposted by CRolim Engenharia on
Hi! In my project, certain areas just has trees and ground cover. For these areas , i will use the landscape factors for mixed trees, shrubs and groundcovers? Thank you!
Owner Manages or Owner Owns -- on a Leased floor
NC-2009 PIf3:Occupant and Usage Dataposted by Andy Record on
We have leased a whole floor of a multi-tennant building of general office space, (CI 2009).
LEED Silver
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Michael Engen on
Are there any LEED credits for exterior paint/coatings? We are building a retail center (shell) & we have an exterior high performance exterior coating.
One paint / two applications / two standards?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Nereyda Rodriguez on
We have a waterborne acrylic enamel that is used in two applications in our project. When applied to steel joists, conduit, etc.
"Other" Sealants and Sealant Primers
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Michelle Rosenberger on
What is the definition of the "Other" category in Rule 1168? I have a BASF product identified as a non-porous sealant primer with 584 g/l that they say complies with EQ4.1 on their letterhead.
heat recovery system for base case ?
CS-2009 EAp2:Minimum Energy Performanceposted by shashank jain on
We are modelling our CS case in Sao Paulo (Climate 2A).
embodied energy
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Jody Solell on
Most if not all construction sites have a generator running to power the site. On new SF home construction the amount of gasoline used during the construction phase is about 100-150 gallons.