Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Pilot Credit #45

Pilot-Credits SSpc45:Site assessment
posted by  Kendal Neitzke  on 

The latest revisions to Pilot Credit #45 are very good.

0

October 2012 Addenda and Reviewer Comment

NC-2009 MRc7:Certified Wood
posted by  April Ambrose  on 

For MRc7, it changes the definition of "Chain of Custody (COC)".

1
Fri Nov 23, 2012, 5:43 am

B Corp certification

EBOM-2009 IOc1:Innovation in Operations
posted by  Lisa Shulock  on 

Has anyone ever submitted an IO credit for B Corp Certification? My client is B Corp certified and wants to get an IO credit. Thanks for any thoughts on this.

1
Fri Nov 23, 2012, 8:08 pm

Asbestos Remediation prior to demolition

Schools-2009 SSc3:Brownfield Redevelopment
posted by  Ben Thompson  on 

We will be building a new school along side an existing school as a replacement.

1
Mon Nov 5, 2012, 6:45 pm

solar exposure

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  gustavo goldman  on 

The building has one of the facades facing east-south. There are trees at street level that block the sun.

1
Tue Oct 30, 2012, 3:01 pm

Cellulose-based paper products

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Anders Olson  on 

The project I am working on has specified a number of products that contain cellulose-based paper, including decorative laminates, signage material and ceiling tiles.

1
Fri Nov 2, 2012, 12:13 pm

Temporary Natural Gas Winter Heat

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Greengrade User  on 

We are currently working on a LEED project where we are using temporary direct fire natural gas heaters for winter heat.

1
Fri Nov 23, 2012, 2:59 pm

Timing for this Prereq

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Nelina Loiselle  on 

Need some advice on timing for this Prereq.

1
Fri Nov 23, 2012, 8:13 pm

Green Power Purchase for LEED NC 2009

Pilot-Credits EApc56:Renewable energy - distributed generation
posted by  Chris Swale  on 

Is there any on-going requirement beyond the initial 2 year contract for a green power purchase?

1
Wed Oct 31, 2012, 12:56 am

Exclusions

Pilot-Credits MRpc53:Responsible sourcing of raw materials
posted by  R Jones  on 

If products have a % of recycled content which is assessed under MRc4 does this mean that the whole product is excluded from these calculations or just the portion which has the recycled content?

1
Fri Nov 23, 2012, 1:42 am