Off-site showers and memberships required

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Reid Middlebrooks  on 

We have a large (over 300,000 s.f.) office tower that is across the street from a national chain fitness center (within 100 yards).

1
Fri Sep 14, 2012, 8:38 pm

No cooling in Proposed Building

CS-2009 EAp2:Minimum Energy Performance
posted by  Johannes Hopf  on 

Our proposed building has no cooling system installed; it is ventilated naturally. Now Appendix G says to model the proposed building like the baseline bldg system. That means with a VAV.

1
Wed Sep 5, 2012, 5:25 pm

Plf3-3 FTE's

General forums
posted by  Kay Sieck  on 

Just got my LEED review back, here is my dilemma, for a Convention Center we calculated FTE's with consideration to dark days, Set up days, Move-in/Move-out days, and Event Days taking into conside

1
Wed Sep 5, 2012, 6:14 pm

Ventilation of a Backup Diesel Generator Closet

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Michael Wironen  on 

We have a small mechanical equipment room that contains a backup diesel generator. It is being ventilated to remove exhaust and excess heat.

1
Fri Dec 21, 2012, 7:13 pm

One product, multiple IEQ credits?

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Katrina Morgan  on 

Should flooring adhesives take credit under IEQc4.1 or IEQc4.3, or both? Thank you!

1
Wed Sep 5, 2012, 8:21 pm

LED Site Lighting

NC-2009 IDc1:Innovation in Design
posted by  buddy pribish  on 

Seems like a no brainer - substituting LED light fixtures in our parking lot will cut energy consumption by 80%. This does not seem to be covered in other LEED credits.

1
Wed Sep 5, 2012, 7:36 pm

Gym with Daylight Provision

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Grace Ming  on 

We have a LEED-CI project with a small Gym. The gym has the daylight provision with full height window. Do we need to provide the photo cell sensors at the gym as well? Thanks.

1
Thu Sep 6, 2012, 2:18 am

Regularly unoccupied rooms

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Alicia Freire  on 

Hello, I am working on a data centre which, as it is common in this type of buildings, has a “Crisis room”.

1
Thu Sep 6, 2012, 6:09 pm

Which rating system

LEED Rating System Selection
posted by  Magnus Stagnäs  on 

Our client is developing an office project consisting of three office towers with a common open plan ground floor and two common basement parking floors.

1
Fri Sep 21, 2012, 8:12 pm

Base Building ASHRAE 62 Compiance

CI-2009 IEQp1:Minimum IAQ Performance
posted by  breeze glazer  on 

IEQc1 requires confirmation that the building services have been designed in accordance with ASHRAE. A statement from the mechanical engineer is required to demonstrate this.

0