Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Non-Default Duration

CI-v4 WEc1:Indoor water use reduction
posted by  Chen Shalita  on 

Hi,

I am wondering if anyone has encountered a situation where are non-default flow duration (for example in a restroom faucet) would be applicable?

Thanks

1
Tue Jun 5, 2018, 4:29 pm

Design Changes

NC-2009 EAp2:Minimum Energy Performance
posted by  PAWAN DAHIWAL  on 

I believe, In any case the proposed building can not be 100% as per design. There will be always variation regarding HVAC equipment selection (e.g.

1
Mon Jun 4, 2018, 3:54 pm

Glossary

BITuser
posted by  Shane Totten  on 

After reviewing BP language today with internal staff, we realized we'll need to add a glossary to explain industry jargon and technical terms that might not be widely used.

0

Any feedback from those that have been through a full review of this ACP?

Pilot-Credits MRpc102:Legal Wood
posted by  Joanna Switzer  on 

Hi there,

Just curious - has anyone been through this ACP successfully?

 

0

Oops - broken chain of custody wood classification?

Pilot-Credits MRpc102:Legal Wood
posted by  Joanna Switzer  on 

Discovered in a project a little too late that FSC doors are being procured /handled by a non-FSC U.S.

0

LEEDv4 ID+C inside a LEED 2009 Core/Shell

SD Leaders
posted by  Allison Wilson  on 

Anyone else having this experience? We've got a LEED 2009 Core/Shell project that we've now been contracted to do a fitout within for one of the first tenants.

0