Demand Control Ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Ricardo Sá on
Dear All,
Natural Land Cover conditions, option 2
NC-v4 SSc4:Rainwater managementposted by Ricardo Sá on
Dear All,
I have some questions regarding SS C4 Rainwater Management: Natural Land Cover conditions, option 2.
balconies and heat island reduction
CS-v4 SSc5:Heat island reductionposted by Sareet Benayahu on
hello, our project has a large balcony on the second floor of the building.
Option 2: Provide Backup Power for critical loads (1 point) - Back-Up Power Time Duration Table 1.
Pilot-Credits IPpc100:Passive Survivability and Back-up Power During Disruptionsposted by Dionisio Franca on
Back-up power time duration table 1 divides facilities in three categories:
SCL Whole Group Web Meeting - Construction Waste
posted by RoseAnn Grimes on
You're invited to join your colleagues in an SCL Whole Group Web Meeting on Construction Waste May 14th, 2019 11am - Noon EST!!
Certified Emissions Reduction Offsets
posted by Mary Ann Lazarus on
Hi: Is anyone individually or at a firm level offsetting their travel through Certified Emissions Reduction (CER) or Verified Emissions Reduction (VER) credits?
Baseline systems exception: A system for the kitchen in all electricity heating source
NC-v4 EAc2:Optimize energy performanceposted by Mohamed Elagiry on
if we have system 6 as The main system which has the electricity as the main heating source, we have an exception for the kitchen according to G3.1.1 b which state to use system 5 or 7 for the
Condo Building with EXTREMELY small units - around 400 sf
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Stacy Smedley on
We are performing blower door tests on a condo project with units as small as 400 sf.