Forum quick links
Open fireplaces
NC-v4 EQp1:Minimum indoor air quality performanceposted by Cristina Florit on
I am working in a hotel project where open fireplaces are being considered.
LEED AP certificate
CI-2009 IDc2:LEED Accredited Professionalposted by Rowena Rawte on
Is the LEED AP certificate of BD+C accepted for ID+C projects? Or would a Legacy LEED AP certificate be accepted - We have both persons working on the project not sure which to upload.
bridging energy and comfort
Pilot-Credits EQpc114:Learning controls for thermal comfortposted by Benjamin Wernike on
Dear All,
Adaptability vs Flexibility
Healthcare-v4 MRc8:Design for flexibilityposted by Margaret Montgomery on
We have a project planning a facility with about 200 beds, planning to use standardized prefab headwalls in the patient rooms, as well as standardizing room layouts to work for multiple room types
Owner´s representative: requirements? can be changed?
posted by Victoria Rios Esteve on
Hi everyone!
Percent of Occupants with access to the fixture.
CS-2009 WEp1:Water Use Reductionposted by Guillermo Hernandez Espinoza on
Hello everyone.
I'm a bit confused with the Percent of Occupants calculation on the Water Use Reduction Calculator.
HVAC system selection for unfinished spaces.
CI-v4 EAp2:Minimum energy performanceposted by Graham Langton on
I have a a single story building that requires a Baseline system 6 (per table G3.1.1A), which according to G3.1.1 is modeled on a floor by floor basis - So I have 1 system.
Testing Procedure
Pilot-Credits EQpc57:Enhanced acoustical performance - exterior noise controlposted by Margaret Hamilton on
We're pursuing this pilot credit for a project in the UK.