Forum quick links
Mixed Model, Mechnical ventilation design
NC-v4 EQp1:Minimum indoor air quality performanceposted by Sandra Lee on
Hello all: I am a newbie here so may this question was brought up. We have a building with a canteen for workers.
Leed for Airports
posted by Nora on
Hello everyone, could someone please send me the guide for airports published in August 2018?.
Thanks.
System 7 Heating source
Healthcare-v2009 EAc1:Optimize energy performanceposted by Davide Liviero on
Dear all,
CDC COVID-19 Update November 2, 2020: Healthy Building Design for Pandemics and Beyond
posted by Mary Ann Lazarus on
This just in from Liz York at CDC: There's a webinar on Friday 11/2 at 3-4 ET on Building Design and Pandemics.
heat pump
NC-v4 WEc4:Water meteringposted by Francesco Passerini on
In order to achieve this credit, permanent water meters can be installed also for "Boiler with aggregate projected annual water use of 100,000 gallons (378 500 liters) or more, or boiler of mo
LEED v4.1 Energy Cost Budget Method - Clarifications
NC-v4.1 EAp2:Minimum Energy Performanceposted by Amal Venugopal on
Hi All,
Greetings!
Hope you all are safe.
Simulation Model upload
NC-v4 EAp2:Minimum energy performanceposted by R.L. Bowen on
Hi! We recently uploaded a project for review. Unfortunately we missed uploading the actual energy model.
Entryway mats stairs / staircase
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Maya Karkour on
Our project has a staircase in front of the entrance. The clearance between the entrance and the stairs is less than 3 meters (about 1 meter).
AIA Materials Pledge has been adopted!
posted by Sarah Cutsforth on
I'm pleased to announce that the AIA Board of Directors has unanimously adopted the A&D Materials Pledge as the AIA Materials Pledge!!!!! The support of so many of yo