Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Transferring numbers from EPA Statement of Energy Performance

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Janna Nash  on 

This question is specifically about taking info from Portfolio Manager and putting into LEED online v.3.

4
Fri Feb 3, 2012, 7:02 pm

Stair Treads and Vinyl Wall Base

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Joseph Snider  on 

The Ref Guide lists wall base as one of the products certified by FloorScore. Does vinyl wall base need to be Floor Score. What about rubber stair treads in exit stairs?

11
Fri Feb 3, 2012, 3:30 pm

Wood Flooring from Italy

CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Sheela I  on 

We are installing wood flooring on our project and it is manufactured in Italy. As they do not have floor score certification - How can this product be documented?

5
Default Avatar
LEEDuser Basic Member
69 thumbs up
Fri Feb 3, 2012, 3:18 pm
6
Thu Feb 2, 2012, 9:43 pm
2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Thu Feb 2, 2012, 4:41 pm

Can a smoking room be regarded as regulary occupied space?

CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spaces
posted by  Noriko Nagazumi  on 

The definition of "regulary occupied space" is described as following; Regularly occupied spaces are areas where one or more individuals normally spend time (more than one hour per person per day o

5
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Feb 2, 2012, 4:39 pm

Omitting an area from the building

General forums
posted by  Mike D  on 

We are certifying an office building and there is one retail space at the ground floor of the building that the project team wants to omit from LEED certification. Can this be achieved? How?

2
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Thu Feb 2, 2012, 4:32 pm

Lighting Fixture of equipment rooms in Data Centre

CI-2009 EAp2:Minimum Energy Performance
posted by  Natalie Wong  on 

We are now working on the lighting fixtures in a data centre. For the equipment rooms, if we follow the baseline in ASHRAE 90.7-2007 by using Space-by-space method i.e.

3
Thu Feb 2, 2012, 3:56 pm

MERV 13 in residences

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Iris Amdur  on 

Has anyone submitted a residential project that has pursued the intent of the MERV 13 filters in an alternate compliance path?

4
Default Avatar
Associate
Arup
LEEDuser Basic Member
9 thumbs up
Wed Feb 1, 2012, 11:40 pm

Mixed Use - Office/ Residential

EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumables
posted by  Lauren Wallace  on 

My project contains 12 floors of commercial office space (95% occupied), a ground floor retail (100% occupied), and 30 stories of residential (30% occupied).

3
LEED Project Reviewer, LEED AP BD+C, Senior LEED Specialist
Certifications Department Manager, Epsten Group, Inc.
LEEDuser Basic Member
26 thumbs up
Wed Feb 1, 2012, 8:32 pm