Exemplary Performance, Option 2, Path 4 (Non-Roof)

CI-2009 SSc1:Site Selection
posted by  Curt Pascoe  on 

This is a follow up to other exemplary performance (EP) discussions that have occurred. I understand that an EP point can be earned under Path 12 of this credit.

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Tue Mar 20, 2012, 8:14 am

"Thumbs up" option?

General forums
posted by  Mara Baum  on 

Tristan, I've read several comments that I would agree with and would like to say the same thing, but the original comment is adequate or even better than my own ideas.

6
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Mon Mar 19, 2012, 11:32 pm

Corridors in Dwelling Units

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Omer Moltay  on 

Dear All, In a residential building with natural ventilation only, should corridors and entry halls in dwelling units be shown to be provided with outdoor air (meaning complying with requirements

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Mon Mar 19, 2012, 10:41 pm

What time does comment period close?

General forums
posted by  Melissa Wrolstad  on 

What time does comment period close? Is it Tuesday at midnight? Thanks- Melissa

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Mar 19, 2012, 8:17 pm

Recycled Content

General forums
posted by  Jessica McNaughton  on 

Am I reading it correctly that the recycled content requirement now includes closed loop recycling process regardless of the amount of any recycled content in the product, so without the closed loo

2
Director of Client Engagement
Natural Capital Partners
LEEDuser Basic Member
42 thumbs up
Mon Mar 19, 2012, 6:12 pm

Basic services within the same shopping center

CI-2009 SSc2:Development Density and Community Connectivity
posted by  Alison Y Rivenburgh  on 

The LEED CI 2009 reference guide states that the project building itself cannot be considered 1 of the 10 basic services; however in a mixed-use building, a maximum of 1 service wtihin the building

2
Mon Mar 19, 2012, 5:48 pm

Mats

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Sam Keehn  on 

We are working on a Mosque in Qatar. All visitors to the mosque remove their shoes prior to entering the building. We would like to avoid placing mats at the entrance due to aesthetic reasons.

3
Default Avatar
Environmental and Sustainability Manager
Energy Management Services, Int.
LEEDuser Basic Member
41 thumbs up
Mon Mar 19, 2012, 3:33 pm
10
fresh leed consultant
SRIBS
LEEDuser Basic Member
3 thumbs up
Mon Mar 19, 2012, 12:28 pm

LEED 2012v3 still conflates performance and transparency

General forums
posted by  Jason Grant  on 

While this version of the MR credits is an improvement over the second draft, it does not go far enough in separating out and balancing rewards for performance and transparency.

3
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Sun Mar 18, 2012, 4:51 pm

Water Based Coatings - Can't count the carrier solvent?

NC-2009 MRc5:Regional Materials
posted by  Dwayne Fuhlhage  on 

I've been working with a subcontractor regarding the documentation requests for regionally based materials on a Platinum project.

5
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 16, 2012, 8:13 pm