Project data forms in LEED OnlineGeneral forumsposted by Tristan Roberts on Mar 24, 2010, 7:07 pm
Tony, I checked around and don't have any tips on your questions. We're not sure exactly what... |
|
COC only for certified woodGeneral forumsposted by Tristan Roberts on Mar 24, 2010, 4:59 pm
Lawrence, your contractor must be getting something mixed up.... |
|
Partial RetrofitEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Tim Trefzer on Mar 23, 2010, 5:17 pm
I have a 55-story building that was built in 1991. 98% of the toilets and urinals are original, however 2% have been retrofit. All of the faucets have been retrofit with aerators. I have created... Last reply: Jason Franken, Mar 24, 2010, 10:11 am |
|
refrigerant quantities as a % of the overall project equip.????CI-2009 EAp3: Fundamental Refrigerant Managementposted by sara frye on Mar 11, 2010, 12:15 pm
We have just received our review acknowledging our phase out plan for CFC based equipment. The next line reads "However the refrigerant quantities as a percentage of the overall equipment has... Last reply: Dan LeBlanc, Mar 19, 2010, 5:42 pm |
|
EQ c7.1, 2.2 for naturally ventilated buildings in mild climateNC-2009 IEQc7.1: Thermal comfort - designposted by Mara Baum on Mar 17, 2010, 9:52 pm
I am working on a pair of naturally ventilated dormitories in a relatively cool/mild climate -- the highest mean monthly temperature is 76 degrees F and the RH is between 60-70%, with some... Last reply: Gunnar Hubbard, Mar 19, 2010, 2:43 pm |
|
Recertification questionEBOM-2009 IEQc1.5: Indoor air quality best management practices - indoor air quality management for facility additions and alterationsposted by Matthew Macko on Mar 18, 2010, 7:47 pm
In five years’ time (or less), when an owner goes to get the building recertified under... Last reply: Jason Franken, Mar 19, 2010, 12:42 pm |
|
Is this Decision Final?Air Sealing Guidance for LEED BD&C IEQp2posted by April Ambrose on Mar 17, 2010, 12:55 pmBased on these comments it seems to me that you are saying blower door tests are required for any residential projects, whether smoking is allowed within the building or not. Does this answer my... Last reply: Tristan Roberts, Mar 19, 2010, 12:38 pm |
|
Sub metering clarificationEBOM-2009 WEc1: Water Performance Measurementposted by RASHID HAMEEN on Mar 17, 2010, 3:18 am
Ours is a production facility which we are intending to achieve LEED. We have the main production building and other supportive building spaces (Canteen, hostels and toilets which are separate... Last reply: Jason Franken, Mar 19, 2010, 12:30 pm |
|
Efficiency calculationEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by RASHID HAMEEN on Mar 16, 2010, 7:47 am
We are planing on pursuing LEEDS for one of our Garment manufacturing facilities. At the moment we are trying to see the status of our water usage compared to the baseline. We bought the... Last reply: Jason Franken, Mar 19, 2010, 12:08 pm |
|
Commissioning during constructionNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Tatjana Ernst on Mar 18, 2010, 12:17 pm
Dear Users, we have to certify a office bulding - new built - which is already on site. Last reply: Jean Marais, Mar 19, 2010, 3:25 am |