Topic | Recent |
---|---|
Social Equity within the Project Team (Option 1)Pilot-Credits IPpc90: Social equity within the operations and maintenance staffposted by Atlas Turner on Mar 17, 2023, 4:35 pmthe Forum button, I get an "Access Denied You are not authorized to access this page" message. Log in or register to post comments ... Last reply: Renee Shirey, Jul 29, 2024, 2:51 pm |
|
Composite wood- Compliance with CARB ATCM or TSCA Title VI is not enough?NC-v4.1 EQc2: Low-emitting materialsposted by Michael on Jul 8, 2024, 1:08 am
Hi LEED experts, My project used composite... Last reply: Kristi Ennis, Jul 29, 2024, 5:16 pm |
|
Select Different Options for Multi-Tenant Buildings?EBOM-v4.1 MRc1: Purchasingposted by Kristina K on Jul 30, 2024, 2:12 pm
Hello, Can different options be selected under this credit if there are multiple tenants in the building? (i.e., one tenant complies with the electronic equipment option, the other... |
|
Energy Star Commercial WasherNC-v4.1 WEp2: Indoor water use reductionposted by Michael Mantai on Nov 20, 2019, 6:32 pmI successfully followed this guidance and simply excluded larger washers: https://leeduser.buildinggreen.com/forum/industrial-washer-vs-commercial... I submitted a project for review (v4, not v4.1) a couple... Last reply: Emily Purcell, Jul 30, 2024, 5:30 pm |
|
Reuse/ Salvage Materials for Option 2- Path 4NC-v4.1 MRc1: Building life-cycle impact reductionposted by Eslam Elshorbagy on Jul 30, 2024, 2:58 pm
Hi everyone, I would like to clarify the difference between... Last reply: Dave Hubka, Jul 31, 2024, 8:45 am |
|
Single LEED building in Zoo: Demand Response Plan required for entire Zoo?NC-v4 EAc4: Demand responseposted by Joyce Kelly on Jul 31, 2024, 4:53 pm
Wondering if the... Last reply: Marcus Sheffer, Jul 31, 2024, 5:26 pm |
|
Best replicating natural site hydrology processesNC-v4.1 SSc4: Rainwater managementposted by Allen Cornett on Aug 4, 2021, 5:40 am
If the rainwater that is captured and used for flush fixtures meets the percentile thresholds can this credit be successfully attemtped? If the rainwater is used for the flush fixtures it would... Last reply: Alexander Postnov, Aug 1, 2024, 4:40 am |
|
"with errata but without addenda"NC-v4 EAp2: Minimum Energy Performanceposted by Alfonzo Collins on Nov 7, 2018, 10:58 am
The LEED v3 reference book already refers to ASHRAE 90.1 "with errata but without addenda." The v4 book only says "with errata." Does that imply that all addenda to ASHRAE 90.1 must be followed... Last reply: Bipin Karki, Aug 1, 2024, 10:41 am |
|
Existing Building or Commercial interior?LEED Rating System Selectionposted by Ammar Yahia on Jul 31, 2024, 4:53 am
We have an existing 45 Storey building consist of 2 basements, ground, two mezzanine, and 40 floors. since the owner tendered a renovation & Maintenace work, replacing all the MEP... Last reply: Kara Strong, Aug 1, 2024, 11:18 am |
|
Name incorrect, and usefulness for USACE in-house designPilot-Credits IPpc90: Social equity within the operations and maintenance staffposted by Alison Kerr on Aug 1, 2024, 12:08 pm
IPpc90 in LEED Online, v4, BD+C is "Social equity within the project team." Not "...the operations and maintenance staff." My comment is regarding the Project Team Pilot credit. This... |