What do you think?LEED v4.1 for Building Operations and Maintenanceposted by Paula Melton on Mar 28, 2018, 3:58 pmhttps://leeduser.buildinggreen.com/forum/black-box-or-transparent-benchm... Log in or register to post comments ... Last reply: Ricardo Filho, Feb 21, 2023, 4:44 am |
|
leedonline offline?Navigating LEED Onlineposted by Caroline O'Leary on Aug 20, 2016, 12:30 amI have been attempting to access leedonline for the last 20 minutes and receive the following: •Make sure the web address... Last reply: Deborah Lucking, Aug 22, 2016, 5:37 pm |
|
Slab-on-grade Vs Slab-below-gradeNC-2009 EAc1: Optimize Energy Performanceposted by Anna Korinkova on May 17, 2018, 8:11 am
We have an office building project with garages going 4 storeys underground. The building foundation slab is about 16m deep. Should this slab still be considered for 'slab-on-grade' (even if it... Last reply: Marcus Sheffer, Oct 9, 2018, 3:51 pm |
|
Pumps: Balancing Report HPs vs DesignNC-2009 EAp2: Minimum Energy Performanceposted by Gaston Viau on May 18, 2018, 8:18 am
Hi there Can we use our pumps Balancing/Start Up Report Hp's rather than the Design? Or does LEED/Ashrae require us to model at design conditions (since Balancing/Start Up Report are ... Last reply: Gaston Viau, Jun 20, 2018, 4:16 pm |
|
Proposed Building's HVAC systemCS-2009 EAp2: Minimum Energy Performanceposted by Luis Andrade on Jun 22, 2018, 9:42 am
Hi everyone, I'm modeling an office building under LEED CS v2009. The scope of C&S includes a centralized cooling and heating system (air cooled chilers and heat pumps), ventilation... Last reply: Tyler Thumma, Oct 7, 2024, 7:44 am |
|
Composite Wood- CARB Phase IINC-v4 EQc2: Low-emitting materialsposted by Brad Newkirk on Jul 24, 2018, 7:49 pm
Does plywood that meets... Last reply: Dawn Garcia, Aug 20, 2024, 12:24 pm |
|
"Impossible" to achieve option 2NC-v4 EQc7: Daylightposted by Sarah Leenknegt on Aug 16, 2018, 5:49 am
Dear, We have made several daylight simulations with option 2 for different projects. So far, it seems nearly impossible to achieve even 1 point for this credit, mainly due to the 3000 lux... Last reply: Francesco Passerini, Mar 20, 2019, 5:09 am |
|
Acceptable Forms of a Tenant Lease Agreement | LEED Design Review CommentsCS-v4 EAp2: Minimum Energy Performanceposted by Eric Schlichting on Aug 22, 2018, 1:14 pm
Hi, I am in the process of responding to a LEED reviewer comment concerning how to claim lighting power... Last reply: Marelle Davey, Nov 3, 2023, 5:22 pm |
|
V4- SSc5- Heat Island Reduction- occupiable roofsCS-v4 SSc5: Heat Island Reductionposted by Thomas Gibbons on Sep 14, 2018, 10:26 am
Hi folks, SSc5 - Heat Island Reduction Core & Shell V4 Working on an office project with occupiable roofs on floors 3 – 8. Each outdoor patio consists of green... Last reply: Glen Boldt, Apr 10, 2024, 1:11 am |
|
Using "Social Equity Within the Project Team" Pilot Credit for a Design-Build projectPilot-Credits IPpc90: Social equity within the operations and maintenance staffposted by Megan Leslie on Sep 18, 2018, 1:20 pm
My company has a CSR report that complies with the requirements in Option 2. We have found that when our company makes up at least 20% (by cost) of the design contract we can easily achieve the... Last reply: JLL Sustainability Consulting, Dec 30, 2020, 11:21 am |