upload daylight calculation of seperate building in a Group for a Master SiteWarehouses-NC-v4 EQc7: Daylightposted by N. Josef Nassif on Apr 26, 2023, 7:39 am
Dear Community I hope you are doing fine. We are doing a master site (office + Warehouse building + Techology Building) project where the two building (warehouse and technology)... |
|
Separate measurement of cold and hot lines for healthcare water usesHealthcare-v4 WEc4: Water meteringposted by Mark Benson on Apr 26, 2023, 12:21 pm
For healthcare projects, projects must "install water meters in any five" water uses listed. However, many of these water uses, such as dietary, laundry, laboratory, etc. include both cold and... |
|
Meters on closed-loop hydronic system makeup waterHealthcare-v4 WEc4: Water meteringposted by Mark Benson on Apr 26, 2023, 12:24 pm
Many healthcare projects have closed-loop hydronic systems for chilled water and heating hot water. Would providing separate meters for chilled water make-up and hot water make-up count as two... |
|
Meter on Domestic hot water vs. Cold-water makeup for domestic hot water systemsHealthcare-v4 WEc4: Water meteringposted by Mark Benson on Apr 26, 2023, 12:32 pm
Can someone explain the difference between a meter measuring domestic hot water consumption and a meter measuring cold-water makeup for domestic hot water systems? The first meter can be used... |
|
Inpatient Visitors using Inpatient Restrooms- How to CalculateHealthcare-v4 WEp2: Indoor water use reductionposted by Heather Ane Zeto on Apr 27, 2023, 1:17 pm
I may be overthinking this - but hopeful someone can chime in with project/review experience! We are working on a new hospital. I understand that the LEED Reference Guide clearly states that... |
|
Job Opening! Manager of High Performance and Sustainable ConstructionHelp Wanted: LEED-related Jobsposted by Susan Heinking on May 2, 2023, 1:42 pm
Looking to make a difference on the Construction side of the industry? Come join Pepper Construction! We are a midwest based... |
|
Process consumptionsWarehouses-EBOM-v4.1 EAp3: Energy Performanceposted by RICCARDO BALLESIO on May 3, 2023, 11:13 am
We are analysing the electrical energy consumption of our client. The building is a warehouse of approximately 10.000 sqm with 1000 sqm of offices. The building is provided with a photovoltaic... |
|
VentilationWarehouses-EBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by RICCARDO BALLESIO on May 3, 2023, 11:19 am
All office spaces are naturally ventilated. The minimum opening location and size requirements are satisfied for all offices, restroom and meeting rooms. In case we find some areas such as... |
|
Calculations for demountable partitionsCI-v4 MRc2: Interiors life-cycle impact reductionposted by Marie Miller on May 3, 2023, 4:30 pm
I'm working on a TI project and we're trying to get the Design for Flexibility point. When calculating for this credit, do we use linear feet or square feet of the product? I'm guessing we... |
|
Excluded requirement of indoor door matt in a tenant space for a CS project?CS-v4.1 EQc1: Enhanced indoor air quality strategiesposted by Maria Nordberg on May 8, 2023, 7:48 am
Our project is trying to implement the credit EQc1 but are having issues regarding entryway system in entrances to our smaller tenants. The building is an existing one which are undergoing a... |