Forum quick links
What is wrong with the submittal template?
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Petra Hajná on
1) There is a bug in the template.
Averaging Compliance Option (ACO)
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Paul Diaz on
I'm working on a LEED project and I have a submittal for a concrete waterproofing product that exceeds the current VOC limit of 100g/l.
IEQp1- A3 Table Mechanical Ventilation 100%OA
Schools-2009 IEQp1:Minimum IAQ Performanceposted by Todor Boyadzhiev on
Hello All, I am working on a school project. The ventilation is "Mechanical Ventilation 100% Outside Air" +natural ventilation in all of the classrooms.
Regularly Occupied vs. Unconditioned
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Mike Halcom on
The review team stated the regularly occupied space listed on the supplemental spreadsheet for Daylight-Views does not match the regularly occupied space listed on PI Form 3 Occupant and Usage Data
Process Energy - Difference between Proposed & Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear all, Can someone please advise on what are the conditions to claim an exceptional calculation for process energy, for having the proposed process energy less than the baseline's? For example
IEQ 6.2 Controllability of Systems - Thermal Comfort
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Sandra Holmström on
Hi! I have a Core & Shell project that is a commercial mall. Is this credit eligible at all for these type of building?
Appendix G - Type of system
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I have a doubt related to the type of system I should consider in a specific case. I'm working on a project where most of the bulding is served by one type of system.
Loading docks in the attached garage?
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Elizabeth Crenshaw Hammitt on
Hello everyone, I just read in the LEED EBOM submittal tips that teams should note that mats are required at loading dock entrances and at entrances from attached garages; this is also noted above
rodent bait blocks vs. paste
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Jutta Berns on
the contractor on one of our project is requesting to use a first-generation rodenticide which is supplied in a solid paste form, packaged in individual sachets (not pellets), rather than in a bloc
Multiple AHU from shared OA
CI-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Wayne Mason on
I have a situation where a mechanical room (4 actually) has two SCU units and one OA inlet.