Topic | Recent |
---|---|
Denied Credits in Precertification ReviewLEED v4.1 Discussion Forumposted by Amjad Ali H Ahmadalshteihi on Apr 13, 2023, 8:42 am
If any credit is denied during the Precertification Final Review Phase, can it be changed for the Design Review without having to Appeal? |
|
Sustainability Manager- Consigli ConstructionHelp Wanted: LEED-related Jobsposted by Steven Burke on Apr 13, 2023, 12:20 pm
Hi, Consigli Construction is hiring a Sustainability Manager for our Massachusetts offices. The position relies heavily on LEED experience as well as a wide array of other sustainability-related... |
|
LEED Timeline / ScheduleLEED v4.1 Discussion Forumposted by on Apr 20, 2023, 10:41 am
Hello! Is there a timeline of when certain credits need to be completed or started during the interior design of a project? Thanks |
|
No issuesPilot-Credits EApc111: Alternative Performance Rating Methodposted by Maureen Mahle on Apr 20, 2023, 12:12 pm
I haven't found any major issue for this credit. |
|
Close-out of INpc156- Safety First: Maintenance of HVAC systems during COVID-19Pilot-Credits INpc156: Safety First: Maintenance of HVAC systems during COVID-19posted by Barry Abramson on Apr 20, 2023, 12:18 pm
We pursued this credit for several projects in 2021/2022. It was useful to ensure adequate HVAC maintenance was sustained through the pandemic, but at this point it should be standard practice.... |
|
INpc139 Safety First Pilot Credit- Building Water System RecommissioningEBOM-v4.1 INc1: Innovationposted by Barry Abramson on Apr 20, 2023, 12:34 pm
We have pursued INpc139 for several projects, and it has spurred buildings to initiate or refresh their Water Management Plans in light of experience through the pandemic. The Water Management... |
|
INpc142 Safety First Pilot Credit Arc Re-EntryEBOM-v4.1 INc1: Innovationposted by Barry Abramson on Apr 20, 2023, 12:46 pm
Although Arc Re-Entry has perhaps passed it's useful life for the COVID-19 pandemic, it was a well-designed tool to manage the re-entry process, which we used for several clients and documented... |
|
Lights mounted under a photovoltaic canopyCS-v4 SSc6: Light Pollution Reductionposted by Samuel Calhoun on Apr 20, 2023, 4:43 pm
Hi. A project I am assessing has a photovoltaic canopy that covers roof parking. Do the lights under this canopy need to be included in the BUG assessment? The engineer has selected indoor, vapor... |
|
Do non-contiguous habitat areas qualify?NC-v4.1 SSc2: Protect or Restore Habitatposted by Jennifer Rennick on Apr 21, 2023, 12:48 pm
We are working on a 4-acre site with multiple buildings that aims to landscape with natives as much as possible. The available planting areas are distributed across the site (a perimeter path,... |
|
Do CO2 Monitoring Code Requirements suffice in lieu of a TSLA for C&S Project?CS-v4 EQc1: Enhanced indoor air quality strategiesposted by Kristen Magnuson on Apr 21, 2023, 2:32 pm
Hi, Does anyone know if a v4 C&S project that is not have any densely occupied spaces in the C&S scope, can use the California Energy Code... |