Pilot Credit INpc155

Pilot-Credits INpc155: Design for Indoor Air Quality and Infection Control
posted by Roxanne Button on Jul 12, 2021, 4:13 pm

Has anyone attempted this Pilot Credit yet?  Our project is a college science building which was under construction during the COVID-19 shutdown, and already incoporates most of the requirements...

Last reply: Michelle Halle Stern, Jun 21, 2024, 10:53 am

Are jet bridges inside or outside the building envelope?

NC-v4.1 EQc2: Low-emitting materials
posted by Theresa Lehman on Jun 17, 2024, 6:27 pm

I am working on an airport project. Are jet bridges (Division 11), considered to be inside or outside the building envelope?

Last reply: Deborah Lucking, Jun 21, 2024, 11:09 am

Minimum Program Requirements- Must use a reasonable site boundary: site + building

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Theresa Lehman on Jun 21, 2024, 10:59 am

This is a complex, multi-part question. An airport project is being phased and has multiple contracts. The scope includes replacing the runways and concrete around the terminals. This is one...

Last reply: Deborah Lucking, Jun 21, 2024, 11:29 am

Calculating FTEs and regularly occupied spaces: Auditorium

Calculating FTEs
posted by Carlos Bueno on Jun 18, 2024, 3:23 pm

Hello everyone,

I have a question: I need to calculate the FTEs and define the areas of regular occupancy for a convention center that includes office spaces and two event halls that could...

Last reply: Andrey Kuznetsov, Jun 22, 2024, 6:39 am

LEED ND Plan on Indoor Water Use Reduction

ND-Plan-v4 GIBp3: Indoor water use reduction
posted by Michael Wahjudi on Oct 30, 2020, 4:27 am

Hi all,

Under GIB Prerequisite: Indoor Water Use Reduction, as the concept plan might be limited on details on fixtures and fittings. Are we able to use letter of undertaking on maximum...

Last reply: Eliot Allen, Jun 22, 2024, 5:03 pm

Entryway system

CI-v4 EQc1: Enhanced indoor air quality strategies
posted by RAMON CHRISTOPHER MEDRANO on Nov 17, 2021, 10:11 pm

I have a office space project, that will have an entryway system (walk off matt). My question is where is the accaptable way to install the walk of matt it should be 10-feet (3meters) inside the...

Last reply: Andrey Kuznetsov, Jun 23, 2024, 6:02 am

Purple Roof

NC-v4 SSc5: Heat Island Reduction
posted by Edgar Arevalo on Jun 20, 2024, 12:29 pm

Has anyone encountered a project where the client or other circumstances suggested we look into purple roof solution.  From the looks of it, it's a green roof solution with optimized stormwater...

Last reply: emily reese moody, Jun 23, 2024, 7:50 pm

Appendix 2 default values

Calculating FTEs
posted by Julio Fernandez Amodia on May 11, 2023, 8:53 am

Dear all,

I am currently estimating the occupancy of a mall building. I have determined the occupancy following Appendix 2 default occupancies from LEED.

However, I am confused...

Last reply: Andrey Kuznetsov, Jun 23, 2024, 5:45 am

Telecommute Option in Arc Transportation Survey

EBOM-v4.1 LTp1: Transportation Performance
posted by on Sep 19, 2023, 4:03 pm

Hello all,

I am trying to figure out what is meant by and how to enter "route" data for telecommuters in the Arc transportation survey. It asks for miles(or km) traveled to the building....

Last reply: RICCARDO BALLESIO, Jun 24, 2024, 8:50 am

Energy Star Rated Equivalent

LEED v4.1 Discussion Forum
posted by Roshan Pradhan on Jun 24, 2024, 5:34 am

Does TM-21 tested LED luminaire, with efficiency greater than 94% at 6000 hours meets the alternate equivalent criteria for Energy star rated products?