Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

area calculations

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Carrie Laurendine  on 

first post ever.. no doubt dumb questions (sorry). Any input much appreciated. 1) do kitchens in a condo development count as regularly occupied? bedrooms?

5
Tue Sep 11, 2012, 7:51 pm

Fans pressure - Baseline and Proposed

NC-2009 EAp2:Minimum Energy Performance
posted by  Luana Bertoletti  on 

Hi, I have a doubt related to the pressure to be considered for the baseline and proposed fan power.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Sep 11, 2012, 6:49 pm

Private vs. Public Lavatory Faucets

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Alison Y Rivenburgh  on 

I am working on two elementary schools, and the lower grade levels have private restrooms intended for individual student use in each classroom.

2
Green Building Consultant
The Cadmus Group
LEEDuser Basic Member
83 thumbs up
Tue Sep 11, 2012, 3:38 pm

School Kitchen Pre-Rinse and Wash Sinks

Schools-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Art Irwin  on 

I am working on a high school project that includes a kitchen with both a pre-rinse sink and a three-tub sink that will have two faucets.

2
Default Avatar
Owner / Energy Engineer / Sustainability Consultant
Sustainnovations, LLC
LEEDuser Basic Member
94 thumbs up
Tue Sep 11, 2012, 3:34 pm

Lease agreement (signed by tenants)

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Rubén M. R.  on 

I'm working on a mixed-use CS project.

2
Building Performance Analyst
The Green Engineer
LEEDuser Premium Member
11 thumbs up
Tue Sep 11, 2012, 3:34 pm

Renovation after LEED certification

LEED Rating System Selection
posted by  Malina Tifrea  on 

A retail project that received Silver certification under LEED CI 2.0 a couple of years ago, is planning a renovation.

3
Tue Sep 11, 2012, 2:25 pm

IAQ Testing method

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Adi Negara, LEED AP BD+C  on 

It's clear that for this credit, LEED only accepted IAQ testing using EPA or ISO method.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Sep 11, 2012, 9:16 am

Facade lighting, Interior / exterior?

CS-2009 EAp2:Minimum Energy Performance
posted by  Robert Gomez  on 

Hello, If facade lighting are installed at the perimeter inside the building, should this be considered interior or exterior LPD? These lights will be controlled / operated by the base building a

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Sep 10, 2012, 11:17 pm

One-time potable water analysis

Pilot-Credits WEpc17:Cooling tower water use
posted by  WAGNER OLIVEIRA SILVA  on 

In the new version of Pilot credit Revised at 1/3/2012 they ask to be done one-time potable water analysis. How do we do if our project already covers 100% makeup water with non-potable water?

3
Mon Sep 10, 2012, 1:42 pm

Tenant fit-out and C&S IEQ Credit 3

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Ricardo Sá  on 

Requirements of C&S IEQ Credit 3 also apply to tenants fit-out ?

3
Default Avatar
Director of Sustainability
Edifícios Saudáveis Consultores (503 910 767)
LEEDuser Basic Member
79 thumbs up
Sat Sep 8, 2012, 1:31 pm