Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Conditioned spaces - Heated & Cooled??

NC-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Dear all, Appendix G states the following: "All conditioned spaces in the proposed design shall be simulated as being both heated and cooled even if no heating or cooling system is to be installe

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Tue Sep 18, 2012, 3:27 pm

LEED Default Recycled Content for Steel

NC-2009 MRc4:Recycled Content
posted by  Abdulrahman Sherazy  on 

Hello friends, what if I got the real recycled content from a supplier of steel and it was less than 25%, can I use the LEED default value then? Is there a limitation for using this exception?

3
Environmental Business Development- LEED AP BD&C
Nucor Corporation
LEEDuser Basic Member
132 thumbs up
Tue Sep 18, 2012, 5:51 am

Facade along the Sidewalk

Pilot-Credits PC14:Walkable Streets
posted by  Candace Small  on 

I am looking for guidance on the following credit requirement: “If a façade extends along a sidewalk, no more than 40% of its length or 50 feet (15 meters), whichever is less, is blank (without do

3
Mon Sep 17, 2012, 9:43 pm

Option 4-Vehicle Sharing Program-Only cars for 8 comply?

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Brooks Critchfield  on 

The credit criteria for Option 4 clearly states that one LE/FE vehicle must be provided per 3% of the FTE . . .

2
Mon Sep 17, 2012, 8:59 pm

"Special" coating requirements for recycled content GWB.

NC-2009 MRc4:Recycled Content
posted by  Charles Fritzemeier  on 

I have a situation where our client is very concerned that GWB with recycled content needs to be specially sealed in order to maintain a healthy environment.

3
Mon Sep 17, 2012, 7:36 pm

The same CxA overseeing EAc3 tasks must ALSO oversee EAp1?

NC-2009 EAc3:Enhanced Commissioning
posted by  Brooks Critchfield  on 

Footnote #4 on page 221 of the LEED-NC v2009 Reference Guide expressly notes that "The same CxA overseeing the enhanced commissioning tasks must also oversee the fundamental commissioning tasks."

4
Mon Sep 17, 2012, 7:24 pm

Federal Land- Landfill Remediation at School Site

Schools-2009 SSp2:Environmental Site Assessment
posted by  Jason Ridings  on 

We are constructing a new school on a U.S. Army base.

3
Default Avatar
Senior Project Manager
Boynton-Williams & Associates
LEEDuser Basic Member
2 thumbs up
Mon Sep 17, 2012, 6:01 pm

Ventilation Systems Designer

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Henrique Mendes  on 

We are working on a small building, and it will have only one small HVAC split system.

3
Mr.
Green Domus | Desenvolvimento Sustentável
LEEDuser Basic Member
13 thumbs up
Mon Sep 17, 2012, 5:03 pm

Wall Base-Flooring EQ4.3 included

CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Melissa Decatur  on 

Should the wall base material be included in the EQ4.3 credit for Flooring or is it only for resilient, stone, and carpet?

2
Mon Sep 17, 2012, 11:20 am

Include portable equipment?

EBOM-2009 EAp3:Fundamental Refrigerant Management
posted by  Jessica Hawley  on 

Comments below say portable equipment that is not base building (but with greater than 0.5 pounds of refrigerant) can be excluded from this prerequisite, but the FAQ section reads: "Yes, small app

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Sep 17, 2012, 6:21 am