Indoor Air Quality Assessment

LEED v4.1 Discussion Forum
posted by Theresa Scherwitz on Jul 26, 2022, 7:36 am

We were planning to achieve Option 2. Air Testing (2 points) for EQ Credit: Indoor Air Quality Assessment.  There are fabric wrapped acoustic panels that will not be installed until after the...

Choosing the correct rating system

Data-Centers-NC-v4 MPR3: Must comply with project size requirements
posted by Dina El-Sady on Jul 26, 2022, 9:45 am

A data cebter building with the white area contributing to only 7% of the total BUA while the rest are offices, elec rooms , video rooms...etc , should it be treated as a data center rating...

Campus DES/CHP and EA Credit Optimize Energy Performance

NC-v4 EAc2: Optimize Energy Performance
posted by Vahid Kompany on Jul 26, 2022, 2:19 pm

Hello All,

Has anyone applied for and used Pilot Credit EApc120 for projects served by district energy to document additional performance improvement to achieve points under Energy...

Natural ventilation Parking garages

NC-v4 EQp1: Minimum indoor air quality performance
posted by Antonio Galicia on Jul 26, 2022, 5:11 pm

Hi everyone

I'm working on an office building where is necessary to design natural ventilation for the parking zones. In order to achieve the ventilation requirements, it's enough to have...

Store in a shopping mall with discontinuous boundaries

CI-v4 MPR2: Must use reasonable LEED boundaries
posted by Thomas Krysinski on Jul 27, 2022, 9:43 am

I am working on the LEED v4 ID+C certification of a store located in a shopping mall. The store is divided in two parts by the mall. Knowing that the shopping mall is not part of the scope of the...

performance period date extension

Performance Period
posted by Elizabeth Seidel on Jul 27, 2022, 11:56 am

We are submitting a v4 EB-OM project and need to know if the performance period for all credits ends on the same date and two (2) credits need to be extended to two weeks later - is that...

Terrace Planters

CS-v4.1 SSc2: Protect or Restore Habitat
posted by Bret Mantyk on Jul 28, 2022, 12:14 pm

I'm wondering if terrace plantes are totally out of scope for Protect or Restore Habitat or if there are certain specifications that would allow for terrace planters to count towards the credit...

WEpc115 Rainwater capture

Pilot-Credits WEpc115: Whole Project Water Use Reduction
posted by Aliesa Adelman on Jul 28, 2022, 1:11 pm

Our project takes into account a...

Building Flush-Out Inquiry

NC-v4.1 EQc4: Indoor air quality assessment
posted by Bolaji Olanrewaju on Jul 28, 2022, 9:08 pm

I am currently working on a LEEDv4.1 NC Office project that is looking to conduct a flush-out pre-occupancy. Would we need to perform the flush-out duration per each zone (e.g. office, lunch room...

MDF base

CS-v4.1 EQc2: Low-emitting materials
posted by Allen Cornett on Jul 31, 2022, 10:43 am

Should...