Topic | Recent |
---|---|
Indoor Air Quality AssessmentLEED v4.1 Discussion Forumposted by Theresa Scherwitz on Jul 26, 2022, 7:36 am
We were planning to achieve Option 2. Air Testing (2 points) for EQ Credit: Indoor Air Quality Assessment. There are fabric wrapped acoustic panels that will not be installed until after the... |
|
Choosing the correct rating systemData-Centers-NC-v4 MPR3: Must comply with project size requirementsposted by Dina El-Sady on Jul 26, 2022, 9:45 am
A data cebter building with the white area contributing to only 7% of the total BUA while the rest are offices, elec rooms , video rooms...etc , should it be treated as a data center rating... |
|
Campus DES/CHP and EA Credit Optimize Energy PerformanceNC-v4 EAc2: Optimize Energy Performanceposted by Vahid Kompany on Jul 26, 2022, 2:19 pm
Hello All, Has anyone applied for and used Pilot Credit EApc120 for projects served by district energy to document additional performance improvement to achieve points under Energy... |
|
Natural ventilation Parking garagesNC-v4 EQp1: Minimum indoor air quality performanceposted by Antonio Galicia on Jul 26, 2022, 5:11 pm
Hi everyone I'm working on an office building where is necessary to design natural ventilation for the parking zones. In order to achieve the ventilation requirements, it's enough to have... |
|
Store in a shopping mall with discontinuous boundariesCI-v4 MPR2: Must use reasonable LEED boundariesposted by Thomas Krysinski on Jul 27, 2022, 9:43 am
I am working on the LEED v4 ID+C certification of a store located in a shopping mall. The store is divided in two parts by the mall. Knowing that the shopping mall is not part of the scope of the... |
|
performance period date extensionPerformance Periodposted by Elizabeth Seidel on Jul 27, 2022, 11:56 am
We are submitting a v4 EB-OM project and need to know if the performance period for all credits ends on the same date and two (2) credits need to be extended to two weeks later - is that... |
|
Terrace PlantersCS-v4.1 SSc2: Protect or Restore Habitatposted by Bret Mantyk on Jul 28, 2022, 12:14 pm
I'm wondering if terrace plantes are totally out of scope for Protect or Restore Habitat or if there are certain specifications that would allow for terrace planters to count towards the credit... |
|
WEpc115 Rainwater capturePilot-Credits WEpc115: Whole Project Water Use Reductionposted by Aliesa Adelman on Jul 28, 2022, 1:11 pm
Our project takes into account a... |
|
Building Flush-Out InquiryNC-v4.1 EQc4: Indoor air quality assessmentposted by Bolaji Olanrewaju on Jul 28, 2022, 9:08 pm
I am currently working on a LEEDv4.1 NC Office project that is looking to conduct a flush-out pre-occupancy. Would we need to perform the flush-out duration per each zone (e.g. office, lunch room... |
|
MDF baseCS-v4.1 EQc2: Low-emitting materialsposted by Allen Cornett on Jul 31, 2022, 10:43 am
Should... |