Forum quick links
Metering Requirements Case 1
CI-2009 EAc3:Measurement and Verificationposted by Matthew Tovar on
For case 1 (project less than 75% of the total bldg sqft), can temporary metering fulfill the metering requirement? If so, under what circumstances (e.g.
a few questions on credit 6.1
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Guilherme Castagna on
I have a few questions on this credit that are buggering me off.
Does a man-made pool meet the requirement?
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by yan lian on
Our project has a man-made pool and has vegetation and fish in the pool, I don't know whether it can meet the requirements?
Industrial machines are considered process energy?
NC-2009 EAp2:Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on
We are working to certify and industrial plant and we are not sure whether the energy consumption from the machinery used for product manufacturing should be included in the energy modeling.
Accounting for Forested Areas
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Melissa Wrolstad on
I have a project with a LEED site boundary that includes some undisturbed naturally forested area. How do I account for this area in stormwater quality calculations?
LTcredit : Green Vehicles
posted by Tanja Arnesson on
Hi, Have a wondering regarding the LT credit, Green Vehicles within the 5th Public Comment periode.
Multiple Bldgs: consider distance to main entrance?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Marcio Alberto Casado Pereira on
Hi folks, We are certifying 4 buildings as a part of an industrial plant.
Modelling of Zone Equipment
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
I have 222 thermal zones. This is a standard size project.
Baseline HVAC
CS-2009 EAc1:Optimize Energy Performanceposted by Elisabetta Annoni on
Hi, I am about to model the baseline HVAC but it's not clear to me how i should select the energy source to determine the system according to table G3.1.1A of standard 90.1.