Recent

Metering Requirements Case 1

CI-2009 EAc3:Measurement and Verification
posted by  Matthew Tovar  on 

For case 1 (project less than 75% of the total bldg sqft), can temporary metering fulfill the metering requirement? If so, under what circumstances (e.g.

3
Wed Oct 17, 2012, 1:34 pm

a few questions on credit 6.1

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Guilherme Castagna  on 

I have a few questions on this credit that are buggering me off.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Wed Oct 17, 2012, 12:22 pm

Does a man-made pool meet the requirement?

EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitat
posted by  yan lian  on 

Our project has a man-made pool and has vegetation and fish in the pool, I don't know whether it can meet the requirements?

2
Wed Oct 17, 2012, 8:35 am

Industrial machines are considered process energy?

NC-2009 EAp2:Minimum Energy Performance
posted by  Marcio Alberto Casado Pereira  on 

We are working to certify and industrial plant and we are not sure whether the energy consumption from the machinery used for product manufacturing should be included in the energy modeling.

5
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Tue Oct 16, 2012, 9:17 pm

Accounting for Forested Areas

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Melissa Wrolstad  on 

I have a project with a LEED site boundary that includes some undisturbed naturally forested area. How do I account for this area in stormwater quality calculations?

3
Default Avatar
Senior Project Manager
CodeGreen Solutions
LEEDuser Basic Member
157 thumbs up
Tue Oct 16, 2012, 7:25 pm

LTcredit : Green Vehicles

General forums
posted by  Tanja Arnesson  on 

Hi, Have a wondering regarding the LT credit, Green Vehicles within the 5th Public Comment periode.

7
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Tue Oct 16, 2012, 2:44 pm
4
Tue Oct 16, 2012, 12:12 am
6
Default Avatar
DOWA-IBI Group Architects
LEEDuser Basic Member
12 thumbs up
Mon Oct 15, 2012, 7:10 pm

Modelling of Zone Equipment

NC-2009 EAp2:Minimum Energy Performance
posted by  Jean Marais  on 

I have 222 thermal zones. This is a standard size project.

5
Mon Oct 15, 2012, 6:38 pm

Baseline HVAC

CS-2009 EAc1:Optimize Energy Performance
posted by  Elisabetta Annoni  on 

Hi, I am about to model the baseline HVAC but it's not clear to me how i should select the energy source to determine the system according to table G3.1.1A of standard 90.1.

3
Mon Oct 15, 2012, 1:44 pm