Log in
Forum
Topic

Can I register a Mock or Dummy Project for training purposes?

General forums
posted by John Smith on Dec 8, 2013, 2:39 pm

I wish to pay the fee and register with LEEDonline (v3) a project about a real building that is to be designed and constructed, but the owner is not interested in obtaining any LEED certification...

Last reply: Tristan Roberts, Dec 9, 2013, 12:29 pm

Full Envelope Commisioning Scope

NC-2009 EAc3: Enhanced Commissioning
posted by Jean Marais on Dec 12, 2013, 10:39 am

of the envelope, once installed it can be too late, so the work is pushed much earlier and is more important. I need to encourage one of my colleagues in these building science firms to help on this forum! Log...

Last reply: Jean Marais, Jan 22, 2014, 2:23 am

90% of average annual runoff

NC-2009 SSc6.2: Stormwater design - quality control
posted by Jamison Hill on Mar 7, 2014, 5:12 pm

Is that the pre-development runoff rate or post-development runoff rate?

Last reply: Michael DeVuono, Sep 2, 2014, 11:09 am

HOV vs. Carpool/Vanpool

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by William Weaver on Mar 10, 2014, 5:13 pm

This feels like a question in semantics, but I'm going to throw it out there anyway. I'm working on a project for the Department of Transportation, and they are planning on providing signage for...

Last reply: William Weaver, Aug 27, 2014, 1:49 pm

3 floors + Attic: LEED Homes or LEED NC?

LEED Rating System Selection
posted by Mario S. on Apr 3, 2014, 9:50 am

Good day,

I have a residential development project outside the U.S which consists of several low-rise buildings of 3 stories + Attic (3rd floor hence consists of a duplex). The attic,...

Last reply: Mario S., Apr 9, 2014, 3:30 am

LEED V4 Reference Guide

General forums
posted by Erika Duran on Apr 4, 2014, 1:22 pm

Why are the credits no longer numbered? This for me is pretty irritating - anyone else have views or comments on this?

Last reply: Erika Duran, Jul 3, 2014, 9:32 am

Fresh air provided by transfer grill

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Maya Karkour on May 23, 2014, 4:32 am

Dear all,

I am consulting on a big project which has small electrical rooms (~30 sq.ft) in the mechanically ventilated parking basement. The Engineers are claiming that it's not practical...

Last reply: Maya Karkour, Jun 6, 2014, 10:10 am

IDC Materials & Resource Calculator- Latest from USGBC??

CI-2009 MRc4: Recycled Content
posted by James Keohane on May 23, 2014, 4:59 pm

I need help identifying what the latest acceptable( to Reviewers) M&R Calculator is for CI. The latest I can find from USGBC Is "IDC Materials and Resources Calculator (June 2012)" . Is...

Last reply: RETIRED, May 14, 2015, 6:03 pm

Lack of PPM data plus suggestions for improvement

Pilot-Credits EApc66: Community contaminant prevention - airborne releases
posted by Jamison Hill on Jul 2, 2014, 6:05 pm

I can only find general pilot documentation requirements for this credit which includes registering for the credit, participating in the LEEDuser forum and completing the survey. Are there any other...

Last reply: Levi Jimenez, Feb 28, 2019, 7:41 pm

Fan Power Calculation

NC-2009 EAp2: Minimum Energy Performance
posted by Jatuwat Varodompun on Jul 12, 2014, 1:18 pm

Let's say we have a HVAC supply fan of a baseline which is calculated to be 3,000 cfm and the baseline fan power at 0.001 kW/cfm.This makes the fan power to be 3 kW. What if the same space has a...

Last reply: Jatuwat Varodompun, Jul 15, 2014, 9:32 am