Excluding Soil Brought in from Off-site

NC-2009 MRc4:Recycled Content
posted by  Margaret McColl  on 

Hello, I'm working on a project where a very large amount of the soil had to be removed due to contamination (we are pursuing SSc3) and clean soil had to be brought in from off-site.

11
Tue Nov 27, 2012, 1:34 pm

"In Site" basic services - the case of a Shopping Center

CS-2009 SSc2:Development Density and Community Connectivity
posted by  Ricardo Sá  on 

I am working in the LEED certification of a Shopping Centre (Core & Shell) where the following stores will be installed: Bank, Beauty Salon, Laundry, Library, Pharmacy, Post-Office, Restaurant,

8
Tue Nov 27, 2012, 10:28 am

Pre Occupancy Filter Replacement for a Tenant

CI-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Laura Charlier  on 

Is a CI project required to replace the filters of the main building AHU? The project is a 5000 sf office space tenant in a 162,000 sf building (no AHU's in the space).

2
Mon Nov 26, 2012, 10:25 pm

RP spreadsheet has same credit listed twice.

EBOM-2009 RPc1:Regional Priority
posted by  Peter Doo  on 

The RP credits for the project zip-code shows the same credit reference listed for RP 5 and RP 6. Does this mean that we get 2 RP points if we achieve the double listed credit?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Nov 26, 2012, 10:14 pm

LEED v2009 Minimum energy savings %

NC-2009 EAc1:Optimize Energy Performance
posted by  Thomas Hellmann  on 

Option 1 compliance path indicates the minimum % savings is 10% for new construction. In the LEED v4 comments a mention was made that the threshold was 12% for v2009.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Nov 26, 2012, 9:56 pm
8
Default Avatar
DOWA-IBI Group Architects
LEEDuser Basic Member
12 thumbs up
Mon Nov 26, 2012, 9:08 pm

Reactive Penetrating Sealers

CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Shane Tohara  on 

On a CI 2009 project we have slab on grade that was initially poured without a water vapor barrier causing moisture issues in the entire sturcture.We would like to polish the concrete and add Reac

4
Mon Nov 26, 2012, 7:47 pm

Semi-conditioned spaces

NC-2009 EAp2:Minimum Energy Performance
posted by  Luana Bertoletti  on 

Hi, I have a doubt related to the definition of "semi-conditioned" spaces.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Nov 26, 2012, 7:13 pm

Task Lighting

CI-2009 IDc1:Innovation in Design
posted by  Kara Hermann  on 

Does anyone know of any IDc1 points associated with task lighting? It was listed on the cutsheet, which made me wonder what it could be for.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Nov 26, 2012, 5:14 pm

"Solvent-free" = 0 VOC ?

CI-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Marco Abdallah  on 

Hi all! The datasheet or manufacuturer advertisement sometimes say that the product is "slovent-free". As paints generally have to solved to be liquid, I guess "solvent-free" in this context means

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Nov 26, 2012, 5:05 pm