Topic | Recent |
---|---|
Definition of Core Learning SpaceSchools-NC-v4 EQp3: Minimum acoustic performanceposted by Mohammad H Abbasi on Jun 25, 2019, 1:07 pm
Hi All, Does anyone know if we need to include metal and... Last reply: Leanne Conrad, Jul 21, 2021, 4:13 pm |
|
REACH registration numberNC-v4 MRc4: Building product disclosure and optimization - material ingredientsposted by Francesco Passerini on Jul 8, 2019, 5:53 am
In safety data sheets the calcium diformat is labeled with REACH registration number 01-2119486476-24-xxxx Therefore I would think that it is included in the REACH lists but in the REACH... Last reply: allen cole, Aug 15, 2022, 8:33 pm |
|
Commissioning FeesNC-v4 EAc1: Enhanced Commissioningposted by Tom Grassi on Aug 13, 2019, 10:57 am
I am looking for updated studies with cost data for LEED v4 Commissioning services, including Enhanced, Envelope and Monitoring-Based Commissioning. "The Cost of LEED v4" is a good publication,... Last reply: Joyce Kelly, Jul 20, 2021, 7:01 pm |
|
Temperature and Humidity LoggingNC-v4 EQc4: Indoor air quality assessmentposted by Nancy Henderson on Sep 20, 2019, 7:38 pm
We have a 2-story building with multiple independently operating HVAC systems. We are looking for guidance on how to log temperature and humidity during the flush-out. The temperature will be... Last reply: Dave Hubka, Feb 14, 2024, 11:32 am |
|
ASHRAE 90.1.2010- Baseline System using Exception of G3.1.1CI-v4 EAp2: Minimum Energy Performanceposted by SSN Energy Model on Oct 2, 2019, 2:01 am
Hi, Greetings! We are doing the energy model for Office space which has registered under LEED ID+C v4. The overall floor area of the project space is 45,000 Sq.ft & the overall... Last reply: SSN Energy Model, Oct 2, 2019, 8:49 pm |
|
Parking Under Cover and SRI RequirementNC-v4 SSc5: Heat Island Reductionposted by Summer on Oct 9, 2019, 4:35 am
Hi, Our project have a 100% parking space under cover which means we are okay with option 2. Do we need to comply with... Last reply: Eric Anderson, Mar 23, 2020, 1:22 pm |
|
Required Materials for LCANC-v4 MRc1: Building life-cycle impact reductionposted by RDK E&S on Jan 10, 2020, 4:06 pm
Hello, We are looking for more information as to what details from Baseline and Proposed models need to be included in the models.
Last reply: Bipin Karki, Jul 17, 2023, 3:04 pm |
|
LEED Green Associates ExamLEED v4.1 Discussion Forumposted by Alexis Stewart on Jan 22, 2020, 3:10 pm
I am taking the LEED Green Associates exam at the end of February. Any advice? Last reply: Shadi Abousamra, Feb 23, 2024, 10:28 am |
|
Green Building Education- Educational Outreach Program vs. Guided TourNC-v4 INc1: Innovationposted by Katy Keene on Feb 17, 2020, 8:12 am
For our project, we are planning on selecting the below two options:
Last reply: emily reese moody, Jun 28, 2023, 9:23 pm |
|
Is it forbidden by the LEED to have à Infrared Taps / sensor taps/automatic TapsNC-v4 WEp2: Indoor water use reductionposted by Sara BENLOUBA on Feb 20, 2020, 2:50 am
Hello, Could you told me if it is forbidden by the LEED standard to put an infrared tap in the toilet? Thanks, Last reply: Olga Yuil, Nov 20, 2020, 9:29 pm |