LEED point adjustment when ASHRAE 90.1-2019 is used as baselineNC-v4.1 EAp2: Minimum Energy Performanceposted by elvin ruya on Nov 3, 2022, 6:45 pm
Is there a direct correlation for LEED points when ASHRAE 90.1-2019 baseline is used instead of 2016? Last reply: Eric Dixon, Mar 18, 2024, 10:21 am |
|
Peak Shaving StrategiesNC-v4 EAp2: Minimum Energy Performanceposted by Dave Hubka on Mar 18, 2024, 1:06 pm
The energy used by electric vehichle charging stations within the LEED Project Boundary is not included within the eneryg model. I am wondering, if electric vehicle charging was 'locked out'... Last reply: Dave Hubka, Mar 18, 2024, 2:02 pm |
|
No More Strigent ThanNC-v4 EQp2: Environmental tobacco smoke controlposted by Hannah Fleck on May 11, 2017, 4:06 pm
Hello, Last reply: Afogreen Build, Mar 19, 2024, 5:18 am |
|
"7% for green vehicles "NC-v4 LTc8: Green vehiclesposted by Santiago Avila on Mar 18, 2024, 10:53 am
"LT Credit Reduced Parking Footprint. Project teams also pursuing the related credit must reserve 12% of total parking capacity for preferred vehicles (with a required 7% for... Last reply: Santiago Avila, Mar 19, 2024, 5:21 am |
|
WEp1_manual wateringNC-v4 WEp1: Outdoor water use reductionposted by Alex Edwards on Apr 29, 2022, 3:27 am
Hi, we have a project for NC, they plan to use manual watering system for the landscape outside the house (they have water dispensers available, the staff will discharge into the bucket and water... Last reply: Santiago Avila, Mar 19, 2024, 5:32 am |
|
PC MRpc87 FeedbackPilot-Credits MRpc87: Verified Construction & Demolition Recycling Ratesposted by Dan Ackerstein on Sep 8, 2022, 3:45 am
Feedback from the architecture firm and general contractors re: PC implementation in Southern California
Last reply: Michelle Rosenberger, Mar 19, 2024, 12:12 pm |
|
Multi-building project- installing renewables on only 1 buildingCS-v4 EAc5: Renewable energy productionposted by Shannon Oletic on Jul 5, 2023, 2:56 pm
We have a multi industrial building project (3 buildings) registered through a Campus Approach (as opposed to Group approach). Is it acceptable to install the rooftop solar PV system on only one... Last reply: Shannon Oletic, Mar 20, 2024, 9:55 am |
|
Total Material CostLEED v4.1 Discussion Forumposted by Arda Buyuklu on Mar 21, 2024, 10:49 am
Why is providing Total Material Cost required/necessary when completing a LEED v4.1 Materials Reporting Form? How is this relevant for LEED purposes, especially if it is almost always subject to... |
|
Exterior Illuminated SignageEBOM-v4 MRc2: Purchasing - lampsposted by Kristina K on Mar 21, 2024, 11:37 am
Hello, Does this credit apply to Exterior Illuminated Signage? Thank you |
|
Can EC3/TallyCAT be used for Option 3: Building Interiors Life Cycle Assessment?CI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Nikhita Sapuram on Aug 8, 2023, 12:03 pm
Most WBLCA software programs do not include product specific data. For a tenant improvement project would it be acceptable to use a program that only looks at environmental impacts from cradle to... Last reply: Kate Holly, Mar 21, 2024, 2:32 pm |