Log in
Forum
Topic

Baseline design by Appendix G

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Evgenia Gorbachinsky on Sep 28, 2010, 4:31 pm

I am doing energy model for LEED for Interiors 2009.
We work on a project that occupies 2 floors of a 7-story building. The
building has already got LEED for Core and Shell . Energy...

Last reply: Evgenia Gorbachinsky, Oct 20, 2010, 8:50 am

Acceptable Submittals

Pilot-Credits PC6: Integrative Project Planning & Design
posted by Batya Metalitz on Oct 19, 2010, 2:06 pm

Many projects have requested more detail or more flexibility on completing the requirements of this credit. As requested, here are some submittals that would be acceptable. As with all pilot...

Last reply: Marcus Sheffer, Oct 19, 2010, 5:07 pm

Regional Material/Recycled Material

NC-2009 MRc5: Regional Materials
posted by Art Kamm on Oct 11, 2010, 3:30 pm

Can we claim the fill used on the site for Regional Material and/or recycled material?

Last reply: Linda Davisson, Oct 19, 2010, 2:01 pm

Req'd # of integrative design team (with owner) seems high

Pilot-Credits PC6: Integrative Project Planning & Design
posted by Renee Shirey on Sep 30, 2010, 3:34 pm

I am all for regularly scheduled LEED/sustainability mtgs with the team, but to have that many (12!) and require the owner to be at each of them stops them from being beneficial working mtgs and...

Last reply: Tammy George, Oct 19, 2010, 1:49 pm

Modeling Proposed Airflow?

NC-2009 EAc1: Optimize Energy Performance
posted by Barbara McCrary on Oct 18, 2010, 4:23 pm

I started a previous thread on DX systems. Let me step back and see if anyone can help me with my larger question - Do we have to model the design airflow rate of our proposed system? A comment...

Last reply: Michael Tillou, Oct 19, 2010, 11:59 am

Documentation Toolkit

EBOM-2009 MRp1: Sustainable Purchasing Policy
posted by Robin Obaugh on Oct 18, 2010, 7:01 pm

Silly question I know, but when utilizing the "template" for the Sustainable Purchasing Policy, should we delete the header and footers related to LEED User?

Last reply: Robin Obaugh, Oct 19, 2010, 11:56 am

Modeling DX systems with set cfm/ton constraints

NC-2009 EAc1: Optimize Energy Performance
posted by Barbara McCrary on Oct 18, 2010, 1:48 pm

I was wondering if anyone had experience modeling DX systems in their proposed systems. I received a USGBC comment that the actual airflow had to be modeled, auto-sizing was not allowed. My...

Last reply: Michael Tillou, Oct 19, 2010, 11:49 am

Ineligible intersections

Pilot-Credits PC9: Street Network
posted by Michael Miller on Oct 19, 2010, 11:36 am

I would suggest that intersections that only serve on-/off-ramps for controlled-access highways also be excluded from being counted for this credit.

EQc6.1 for multi-occupant spaces

CI-2009 IEQc6.1: Controllability of systems - lighting
posted by Michele Helou on Oct 4, 2010, 12:55 pm

Does anyone know if multi-occupant spaces such as exhibit spaces or lecture rooms without...

Last reply: Danuta Drozdowicz, Oct 18, 2010, 9:30 pm

LEED Online

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Paul C on Sep 20, 2010, 10:29 am

I want to make sure I am understanding this correctly in filling out LEED Online, I am a little confused when filling out LEED Online:

-I have an multi-tenant office building so everyone...

Last reply: Dan Ackerstein, Oct 18, 2010, 6:42 pm