Topic | Recent |
---|---|
HERS index rating USGBC-approved equivalent for projects outside the U.S.Homes-v4 EAp1: Minimum Energy Performanceposted by Micaela Smulevich on Jun 4, 2020, 11:52 am
We are working with a project outside US, and need information on USGBC-approved equivalent for HERS index rating for projects outside the U.S. |
|
Is residential project are not eligible for Option 2?NC-v4.1 WEc3: Optimize Process Water Useposted by Leanne Niu on Jun 5, 2020, 2:56 am
we have a residential project with no cooling tower, if it is eligible for Option 2? |
|
Facade Role in LEED certificationGreen Globes Discussion Forumposted by Leonardo Flores on Jun 7, 2020, 6:08 pm
Hi LEEDusers.. I am new here and would like to hear any of your feedback on below. I understand that the facade or building envelope/... |
|
Flush-out applicable GFANC-v4 EQc4: Indoor air quality assessmentposted by Ricardo Sá on Jun 8, 2020, 7:43 am
Dear All, In what relates to flush-out option, the guide specifies that 4 267 140 liters of outdoor air per square meter of... |
|
Management Plan Addressing How Pollution and Eutrophication of Waterways Would Be Minimized through Operational ChangesNC-2009 SSc6.2: Stormwater design - quality controlposted by Sandra Lester on Jun 8, 2020, 7:59 am
We have been asked by the CaGBC to provide a management plan addressing how pollution and eutrophication of waterways would be minimized through operational changes. As required in the LEED... |
|
Strategy to retain runoffNC-v4 SSc4: Rainwater managementposted by Ricardo Sá on Jun 9, 2020, 6:52 am
Dear All, This credit requires that project retains on site (i.e. infiltrate, evapotranspirate, or collect and... |
|
Public Transportation subsidy?NC-v4 LTc5: Access to quality transitposted by Erin Holdenried on Jun 9, 2020, 11:54 am
Reduced Parking and Green Vehicles offer credit for 20% discount in place of preferred parking. Has anybody tried a similar ACP approach for this credit? To get some credit, such as 1 point, if... |
|
Where can I find the coefficients of evapotranspiration for projects in Morocco?NC-v4 WEp1: Outdoor water use reductionposted by Sara BENLOUBA on Jun 11, 2020, 11:13 am
Hello Dears, For the purposes of calculating the pourcentage (%) of the saving of outdoor water compared to baseline, I need the coefficients of evaportranspiration. We could find a ... |
|
Sisal 100% Natural Fiber CarpetNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Andrea Tirao on Jun 15, 2020, 8:48 am
Our project is a museum which targets IEQc4.3. One of the specified carpet for the project is 100% Sisal and we cannot find a manufacturer of Sisal with Green Label or Greenguard certification.... |
|
WELL 36:Water treatment w/Ultraviolet germicidal irradiation as a LEED v 4 ID creditWELL v1 Building Standard Tip Sheetposted by Elda Silva on Jun 15, 2020, 6:22 pm
Hello, I am wondering if Ultraviolet germicidal irradiation at the water Inlet valve of the project could be used as an ID credit for LEED v4. The project is located in northern Peru,... |